Projects  
 
  Category:   Water  |  Environmental  |  Infrastructure  |  Transportation  |  Urban Development


Water

 
 

Water Treatment

Aldergrove Well Water Treatment Plant

Buffalo Pound Water Treatment Plant

E.L. Smith Water Treatment Plant

Loch Lomond Temporary Water Treatment
Facility


Secondary Disinfection Stations

Two Stage Filtration Pilot Study

Wabamun Lake Level Mitigation and Water
Treatment Plant


Water Treatment Plant Expansion

Water Treatment Plant

Water Storage & Distribution


Pump Station and Reservoir Seismic
Assessment


Grandview Reservoir

Glenmore Water Treatment Plant High Lift
Pump Station


Main No. 1 Replacement Phases 2 and 3

James Street Booster Station

Langley Reservoir and Pump Station

Hanlan Feeder Main, Contract No. 4

Wastewater Treatment


Annacis and Lulu Secondary Treatment
Plants, Vancouver

Regional District of Nanaimo Wastewater
Engineering Services

Gold Bar Wastewater Treatment Plant
Bioreactor and Clarifier #11, Edmonton

Red Deer Wastewater Treatment Plant

Banff Wastewater Treatment Plant Upgrade

South Shore Water Reclamation Facility
Membrane Bioreactor (MBR) Wastewater
Treatment, Alberta

Moose Jaw Sewage Treatment Master Plan

Montreal Lake Cree Nation Lagoon Expansion

Woodward Avenue Wastewater Treatment
Plant Wet Weather Flow

Conestogo Wastewater Treatment Plant

Front Street Wastewater Treatment Plant,
Bermuda

Marine Disposal, Bermuda

South Coast Sewage Project Marine
Disposal, Barbados


Wastewater Collection

Ratmalana-Moratuwa Wastewater Collection

Double Barrel Pipe Repair and Replacement


West Branch CSO Detention Facility

West Thickwood Heights, Sanitary Sewer
Upgrading


Cloverdale Sanitary Sewer Overflow

Western Beaches Storage Tunnel

Stormwater Management

Brandt's Creek Drainage Improvements

Fraser River Flood Control Program

Fulton Creek Regional Wetlands

Marina Garden Estates

Stormwater Management Plans


West Langley Dyke Pump Station

Combined Sewer Overflow Control
Alternatives

Water Resources

Hydraulic & Hydrologic Engineering

Inflow/Infiltration Assessment & Modelling
(SEWHYMO)


Hydraulic Transient Analysis of Buffalo Pound
– Regina Pipeline Expansion

Tracer Studies – Tools for Assessing
Compliance & Optimization Needs


Master Drainage Plan

Clareview Sanitary Trunk Sewer Assessment


Structures


Burnaby Lake Pilot Dredging Project

40 Mile Coulee Pumping Station

Thirsk Dam and Spillway Rehabilitation

Water Intakes and Pump Stations

Irrigation

Little Bow River Project – Clear Lake Canal


Monarch 61B Check Structures

Watershed Management & Environmental Protection

Master Water Plan

Water System Master Plan/Water Quality
Review


Abitibi River Water Management Plan

Magnetawan River Water Management Plan

Long Term Water Strategy

Water Reuse


South Shore Water Reclamation Facility MBR Wastewater Treatment Plant

Water Enhancement Project, Stettler


Effluent Pumping and Transmission


Sewage Treatment Master Plan

Water Supply

Grandview Reservoir

James Street Booster Station

Main No.1 Replacement Phase 2 and 3

Wabamun Lake Level Mitigation and Water
Treatment Plant Project


Bearspaw Raw Water Intake and Pump
Station


Associated Engineering Helps Town of Banff
Meet Environmental Challenges


Raw Water Supply Facilities

Regional Water Systems Overview

Water Supply Master Plans

West of Bangkok Communities Water Supply
Feasibility Master Plan & Privatization Study


Water Supply Rehabilitation of Four Towns

 
 



Transportation

 
  Bridges

15th Avenue Pedestrian Bridge

88th Avenue Bridge

Bloedel Creek Bridge

BNR Grade Separation

Chemainus River Bridge

Circle Drive and 33rd

Duke Point Underpass

Helmcken Underpass

John Hart Bridge

Johnson Mariner Way Connector

Key Lake to McArthur River Haul Road
Bridges


Mill Bay Pedestrian Bridge

Municipal Bridge Inspection Programs

Murung River Bridge

Oldman River Bridge

Ram River Bridge

Skeena River Bridge

Smoky River Bridge

Suncor Athabasca River Bridge,

Yellowhead Trail Winterburn Road
Interchange Structure



Roads and Highway

96th Avenue Interchange and Roadway
Extension/Design Construct


Highway 3 Upgrading

Johnson-Mariner Connector

North Watts Road to Transfer Beach

Stave-Winslow Creek Forest Service Road

Victoria Approaches Helmcken Interchange

Whitesail Mainline
 

Airports

Campbell River Airport Upgrade

Calgary International Airport Taxiways

Runway 16-34 Approach Lighting
Replacement


Edmonton International Airport

Rankin Inlet Forward Operating Location

New Parallel Runway, Site Development,
Vancouver International Airport


New Parallel Runway, Airfield Lighting System, Vancouver International Airport

Bermuda Runway Rehabilitation

Transit

ALRT Fraser River Crossing North Approach
Spans


Northeast LRT Subway

Northwest LRT Subway

Rapid Transit Project 2000 Front Street
Guideway

Container & Intermodal Facilities

Centennial Pier Repaving, Vancouver


Deltaport Container Terminal, Roberts Bank

Deltaport Container Terminal – Pod 4


Roberts Bank Container Expansion Feasibility Study





 
 



Infrastructure


 
  Program Management
Project Manager – Pemberton Wastewater
Treatment Plant Design Build


Langley Reservoir and Pump Station

Jamaica Highway 2000

John Hart Bridge

Asset Management

Assessment and Strengthening of Highway
Maintenance Capabilities


Infrastructure Master Plans

Coquihalla Transportation Concession
Project Asset Inventory & Condition Study


Utility Master Plan

Risk Assessment Studies of Water and
Wastewater Systems in B.C., Indian &
Northern Affairs Canada
  Land Development

Magic Estates Residential Development


Canadian Tire Stores

Regina Research Park


Infrastructure Rehabilitation

Double Barrel Pipe Repair & Replacement
Strategic Plan & Area Concept


PCS Pipeline Rehabilitation

Sodium Chlorate Plant, Bruderheim

Infiltration/Inflow Reduction Program
 
 



Environmental


 
  Odour Control

Buffalo Avenue Biofilter Project

Wastewater Plants, Odour Control

Odour Mitigation Study

Solid Waste Management

Clover Bar Leachate Treatment Facility

Waste Management Study

Peer Review of Proposed Remedial Action
Plan to Cap Four Waste Disposal Sites


Landfill Design

Class 2 Landfill Containment Cell


Campbell Mountain Landfill

Closure Plan for Quarry Road

Class II Landfill


Environment Impact Assessments

Stormwater Quality Control Guidelines, B.C.
Building Corporation


Fraser River Flood Control Program

Dredging Feasibility Study

Greater Nanaimo Water Pollution Control
Centre Receiving Environment Monitoring
  Composting

Edmonton Composting Facility

Biosolids Management Strategy and Review

Biosolids Composting Facility

Biosolids Composting

Seismic

Second Narrows Bridge Retrofit

Burnaby Bridge Inspections, Seismic
Evaluations, and Seismic Retrofitting


Seismic Upgrading of Helgesen Reservoir

Mission Bridge No.2317 Seismic Safety
Retrofit Strategy
 
 



Urban Development
 
  B.C. Place/Expo '86 Development

Dundarave Village Revitalization

Shanghai Links Executive Community

Shopping Centre Developments
     
 
 
 

About AEWaterTransportationInfrastructureEnvironmentalNews RoomAE TodayCareersContact UsSite MapHome