Location
Kitimat, British Columbia
Expertise
Transportation
Bridges
Remote & Resource Bridges
Share
Associated Engineering, through our Alternate Delivery Company (Brybil), teamed with the Ledcor-Haisla Limited Partnership to design and construct three bridges on the new heavy haul road at the LNG Canada plant site near Kitimat, BC.
The three bridges were required to be designed to support heavy self-propelled modular transport (SMPT) vehicles, transporting heavy plant-site modules arriving by ships. The weight of the SMPT vehicles was up to 1,348 tonnes with 48 tonne axle loads.

Client
Ledcor Group

Project Highlights
The three structures designed and built included the Anderson Creek Bridge, Moore Creek Bridge, and the Beaver Creek Culvert.
People on this project
More Transportation Projects
See all projects

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Transportation
Broadway Street Improvements

Bridges
SkyTrain Grandview Cut Structural Upgrade

Transportation
Pioneer Pedestrian Bridge

Transportation
Casino Mine Access Road

Transportation
Shell Canterra Road

Transportation
7 Avenue S. Bike Boulevard

Transportation
Granville Bridge Seismic Retrofit and Renewal

Transportation
John Hextall Bridge Rehabilitation

Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment

Transportation
McKay River Bridge

Transit
SkyTrain Crossing of South Point Drive

Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair

Roads
Johnson-Mariner Way Connector

Transportation
Medicine Hat Transit ITS Decision Support
LEADERSHIP INSIGHTS
See all insights








