Location
Waterton National Park, Alberta
Expertise
Transportation
Bridges
Pedestrian Bridges
Share
Following the wildfire in Waterton National Park in the summer of 2017, Parks Canada retained Associated Engineering to completed design and construction services for six damaged/destroyed bridges.
The scope of work included the development of standard bridge superstructures drawings to support standard replacement of National Park Bridges, with span lengths of 6, 10, 12, and 14 metres.
The bridges replaced included the Snowshoe Bridge, Akamina Pass Bridge, Dipper Ski Trail Briges #1 and #2, Experts Choice Bridge, and Bertha Falls Bridge.
Client
Parks Canada
Project Highlights
People on this project
More Transportation Projects
See all projects
Transportation
Bobtail Forest Service Road Overpass
Active Transportation
Highway 1 at Mountain Highway Interchange
Airports
Nanaimo Airport Airfield Electrical Upgrading
Transportation
St. Andrews Lock and Dam Bridge Deck Replacement
Bridges
SkyTrain Grandview Cut Structural Upgrade
Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways
Transportation
7 Avenue S. Bike Boulevard
Streetscaping
Langford Cultural District
Transportation
Fourth Street Pedestrian Overpass
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Transportation
Medicine Hat Boardwalk Replacements
Transportation
Medicine Hat Transit ITS Decision Support
Transportation
LNG Canada Heavy Haul Bridges
Infrastructure
Chippewas of Nawash First Nation – Roads and Culvert Flood Damage Repair
Transportation
Ice Engineering and Ice Safety for Tibbitt-Contwoyto Winter Road
LEADERSHIP INSIGHTS
See all insights