Location
Calgary, Alberta
Expertise
Infrastructure
Urban Drainage
Share
Two weeks after the June 2013 flood, Sunnyside’s stormwater system received a rainfall that couldn’t be discharged to the Bow River, as most of the outfall gates were closed to protect the community.
The City of Calgary worked with Associated Engineering to examine this unusual flooding sequence and propose resiliency upgrades.
When historical analysis showed that high-intensity rainfall and high river levels had been independent, the team suggested an innovative dual level of service approach, substantially reducing the cost of improvements. A first for the City, this approach sets a precedent for other floodplain communities seeking cost-effective stormwater management solutions.
Client
The City of Calgary
Project Highlights
People on this project
More Infrastructure Projects
See all projects
Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study
Buildings
Riel Recreation Park Redevelopment
Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade
Environmental
Climate Change Risk Assessment
Land Development
Lethbridge Crossings Development
Infrastructure
Rosehill Reservoir Rehabilitation
Downtown and Main Street Revitalization
West Rossdale Redevelopment
Streetscaping
Langford Cultural District
Hydrotechnical
Medicine Hat Flood Assistance
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Infrastructure
Clayton Reservoir
Infrastructure
Thirsk Dam and Spillway Rehabilitation
Infrastructure
Tsawwassen Mills Mall
Transportation