Location
Calgary, Alberta
Expertise
Infrastructure
Urban Drainage
Share
Two weeks after the June 2013 flood, Sunnyside’s stormwater system received a rainfall that couldn’t be discharged to the Bow River, as most of the outfall gates were closed to protect the community.
The City of Calgary worked with Associated Engineering to examine this unusual flooding sequence and propose resiliency upgrades.
When historical analysis showed that high-intensity rainfall and high river levels had been independent, the team suggested an innovative dual level of service approach, substantially reducing the cost of improvements. A first for the City, this approach sets a precedent for other floodplain communities seeking cost-effective stormwater management solutions.

Client
The City of Calgary

Project Highlights
People on this project
More Infrastructure Projects
See all projects

Bridges
Engineering services for Houston Forest Products

Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating

Infrastructure
Irrigation System Strategy

Buildings
Riel Recreation Park Redevelopment

Containment Systems
Cell 3 East Halton Waste Management Site

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Infrastructure
Gold Bar Wastewater Treatment Plant

Hydrotechnical
Medicine Hat Flood Assistance

Infrastructure
West Edmonton Sanitary Sewer Tunnel W12

Infrastructure
Kluskus Village Domestic Water System Improvements

Transportation
Canmore Bridge Management

Streetscaping
Nigel Valley Public Spaces

Infrastructure
Ice Engineering, Safety Services, and Road Management Plan

Infrastructure
Kahkewistahaw Landing

Transportation
Broadway Street Improvements
LEADERSHIP INSIGHTS
See all insights










