Location
Fort McMurray, Alberta
Expertise
Building Structures
Electrical Instrumentation & Controls
Land Development
Share
The Main and Central Substations are the largest that Associated Engineering has designed.
We provided civil, structural and building mechanical engineering expertise on six substation yards (Main, Central, South West, Ore Preparation Plant, Extraction & Tailings, and Co-Gen), and 10 skid substations (four Shovel Subs, two Hydro-transport Booster Subs, two Tailings Booster Subs, one Barge Sub, and one Out-of-Pit Tailings Area [OPTA] Sub). The facilities were designed to deliver 13.8 kV power, the utilization voltage, to various locations within the Fort Hills Facility.


Project Highlights
13.8 kV
power
More Building Structures Projects
See all projects

Building Mechanical
Eiling Kramer Campground Park Service Centre

Building Mechanical
St. Albert Naki Transit Centre and Park & Ride

Building Mechanical
Oakmont Pump Station Upgrades

Buildings
Riel Recreation Park Redevelopment

Buildings
Heron Hall

Building Structures
Broadview Drive Commercial Development

Pump Stations
Horseshoe Slough Drainage Pump Station

Buildings
Wood Innovation and Design Centre

Building Structures
Columbia Street Pump Station

Building Mechanical
Centennial Arena Expansion

Building Structures
Kinsmen Park PotashCorp Playland

Building Mechanical
Martensville Athletic Pavillion

Water
Fort Chipewyan Water Treatment Plant Expansion

Infrastructure
Livestock and Forage Centre of Excellence

Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
LEADERSHIP INSIGHTS
See all insights