Santos Construction Ltd., a family-owned and operated builder, retained Associated Engineering to provide project management and multi-discipline consulting services for the commercial development in Sherwood Park, Alberta.
Services included site servicing, site grading, storm water management, coordination of architectural (Douglas Sollows Architect Inc.), civil and structural engineering, building mechanical engineering (Nowak Engineering Inc.), and electrical engineering (ReLumen Engineering Inc.)
The site design was challenging in that it required up to 2 m of reinforced gravity retaining walls to optimize the surface area of the property to accommodate the required parking and landscaping buffers.

Client
Santos Construction Ltd.

Project Highlights
2 m
reinforced gravity retaining walls
15,000ft2
each level
The building structure consists of grade beam on screw-piled foundations, structural steel framing, and a composite concrete second floor with an insulated styrene-butadiene-styrene membrane roofing system. The facades consist of an exterior insulated finish system made up of acrylic stucco, pre-finished metal cladding, and brick. Providing approximately 15,000 ft2 on each level, the building is split into ten office condominiums on each of the two levels. The lower level condos are equipped with overhead doors, thus offering flexibility to accommodate a variety of tenants and their business needs.
The project team designed the building for maximum flexibility, to accommodate a range of occupants and their business needs, including commercial, professional services, and light (low hazard) industrial activities. The building layout facilitates aggregating adjoining condo units, based on the space needs of the tenants.
The project was successfully completed in May 2013.
More Building Structures Projects
See all projects

Pump Stations
Horseshoe Slough Drainage Pump Station

Water Treatment
Russell Binscarth Water Treatment Plant

Building Structures
26 SW Marine Drive Commercial Development

Building Structures
Bone Yard Operations Centre Office Expansion

Building Mechanical
Eiling Kramer Campground Park Service Centre

Building Mechanical
Elijah Smith School Energy Audit

Building Structures
Oliver Bowen Light Rail Vehicle Storage and Maintenance Facility

Building Mechanical
St. Albert Naki Transit Centre and Park & Ride

Buildings
Heron Hall

Building Mechanical
Craigflower Pump Station

Building Structures
Elkford Community Centre

Buildings
Stoney Nakoda Child & Family Services Building Assessment

Buildings
Corix Biomass Energy Centre

Infrastructure
Livestock and Forage Centre of Excellence

Building Mechanical
Van Kam Freight Way Terminal
LEADERSHIP INSIGHTS
See all insights