Location
Russell, Manitoba
Expertise
Water Treatment
Water
Water Supply, Storage, & Distribution
Pipelines
Building Structures
Infrastructure
Share
Associated Engineering (AE) was retained by the Manitoba Water Services Board and the Municipality of Russell Binscarth to design a new Regional Water Treatment Plant in the Town of Russell to provide a safe and reliable potable water supply to the region.
The Russell – Binscarth Regional Water Treatment Plant was constructed in 2017 and began providing treated water to Russell, Binscarth, Angusville, Rossburn, and Gambler First Nation in 2018/19. The plant draws water from two 300mm ground water wells, and supplies treated water to the region, including to Rossburn, which is over 45km away.
Client
Municipality of Russell Binscarth
Project Highlights
45
L/s Treated Water
More Water Treatment Projects
See all projects
Computational Fluid Dynamics Analysis
E.L. Smith Water Treatment Plant Upgrade
Water Treatment
South Fork Water Treatment Plant
Water Treatment
Island Water Treatment Plant
Electrical Instrumentation & Controls
Solar Photovoltaic System Installation – WTP and Pumphouse
Energy
Process Energy Audits
Wastewater Collection & Storage
Live Online Water and Wastewater Operator Training
Water Treatment
Fort McMurray Wildfire Response
Water Treatment
Glenmore Water Treatment Plant Upgrades
Environmental
Climate Change Risk Assessment
Water Treatment
Keswick Water Treatment Plant Upgrades
Water
Japan Gulch Ultraviolet Disinfection Facility
Water
Fort Chipewyan Water Treatment Plant Expansion
Infrastructure
Kluskus Village Domestic Water System Improvements
Building Mechanical
Arbutus Water Treatment Plant
Energy