Conceptual, Preliminary and detailed design, as well as construction contract administration services were provided by Associated Engineering to expand and upgrade this 18,200 m³/day (4.0MIGD) water treatment plant.
The expanded plant supplies the Town of Lakeshore with 27,300 m³/day (6.0MIGD) from Lake St. Clair to meet the demand for a 20-year projected population. A number of plant components were sized to meet the projected 40-year demand of 36,400 m³/day (8.0MIGD).
The proposed expansion included the following electrical and instrumentation upgrades:
- Outdoor high voltage 1500kVA transformer, disconnect switch, and indoor switchgear
- Three new MCC line ups for Water Treatment Plant, High Lift Pumping Station and Low Lift Pumping Station
- HVAC and lighting design through the plant
- Process control systems including 10 new PLCs.
Preliminary design was completed in September 2004 and detailed design in November 2005. Construction of this project was completed by the fall of 2008 at a capital cost of $30 million.
![Map Image](https://www.ae.ca/wp-content/themes/ae/images/maps/Ontario.png)
Client
The Town of Lakeshore
![Blue Section](https://www.ae.ca/wp-content/themes/ae/images/blue_section.png)
Project Highlights
1500kVA
transformer
$30M
capital cost
More Buildings Projects
See all projects
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/Parcel-21-thumb.jpg)
Buildings
Simon Fraser University Parcel 21
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/misericordia-hospital-tn.jpg)
Buildings
Misericordia Community Hospital Electrical Upgrades
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/tnc928a9391b316d6b9fc9ff00001037d2.jpg)
Infrastructure
Rosehill Reservoir Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/pelham-patrol-yard-tn.jpg)
Infrastructure
Pelham Patrol Yard Fuel Tank Replacement
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/img_chiefaranazhischool_20220627_143446-thumb.jpg)
Buildings
Chief Aranazhi School Upgrades
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/dji_export_1657747263747.jpg)
Buildings
Corix Biomass Energy Centre
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/heron-hall-tn.jpg)
Buildings
Heron Hall
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/riel-park-building.jpg)
Buildings
Riel Recreation Park Redevelopment
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/thumb.jpg)
Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/regina-lift-station-tn.jpg)
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/AE-Gitwinksihlkw-Water-Treatment-Plant_004.jpg)
Infrastructure
Gitwinksihlkw Water Treatment Plant
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/tsawwassen-sewage-tn.jpg)
Infrastructure
Tsawwassen First Nation Sewage Treatment Plant
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/NIX_5888.jpg)
Pump Stations
12th Avenue Drainage Pump Station
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/manitoba-hydro-keeyask-camp-tn.jpg)
Buildings
Manitoba Hydro – Keeyask Camp
![Project Image](https://www.ae.ca/wp-content/uploads/2023/09/IMG_6882.jpg)
Water
Jericho Reservoir
LEADERSHIP INSIGHTS
See all insights
![](https://www.ae.ca/wp-content/uploads/2024/07/tachet-1.jpg)
![](https://www.ae.ca/wp-content/uploads/2024/07/brampton-hall-1.jpg)
![](https://www.ae.ca/wp-content/uploads/2024/07/siksika-1-900.jpg)