Location
Calgary, Alberta
Expertise
Environmental
Climate Change Adaptation & Mitigation
Infrastructure
Water Supply, Storage, & Distribution
Water Treatment
Strategic Advisory Services
Share
The City of Calgary retained Associated Engineering to perform a water supply infrastructure climate change vulnerability assessment.
This included the entire potable water supply system from the watershed to the distribution system including dams, pump stations, treatment plants, reservoirs and piping. The study was conducted using the Engineers Canada Public Infrastructure Engineering Vulnerability Committee (PIEVC) protocol.
The purpose of the study was to identify components of the potable water supply system that are vulnerable to future (years 2020 and 2050) extreme climatic events or significant changes to baseline climate design values compared with the past data used for design. This included assessing sensitivities of infrastructure to the changes, in terms of positive or negative consequences of changes in applicable climatic conditions and, also assessing the built-in capacity of infrastructure to absorb any net negative consequences from the predicted changes in climatic conditions.
The basis of the methodology involved assessing various climate change models and superimposing that data over the design and operational characteristics of the water supply system to identify and assess risks to the infrastructure, its expected life and performance.
Project Highlights
More Environmental Projects
See all projects
Environmental
Environmental Assessments, Southeast BC
Environmental
Data System Planning
Environmental
Coldstream Ranch Gravel Extraction and Reclamation Plan
Environmental
37 Street SW Storm Trunk Relocation
Environmental
Kelowna Airport Soil Salvage and Enhancement Strategy
Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill
Buildings
Corix Biomass Energy Centre
Environmental
Deh Cho Bridge, Environmental Services
Environmental
Port of Vancouver – Climate Change Adaptation
Environmental Assessment
Highland Valley Copper Mine, Environmental Impact Assessment
Environmental
Big Bend Master Drainage Plan
Environmental
Regulatory Application and Approvals, Valley Line LRT
Soil Bioengineering
Blackmud Creek Erosion Feasibility Study and Design
Environmental
Okanagan Valley Drought Planning
Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study
LEADERSHIP INSIGHTS
See all insights