Solar Photovoltaic System Installation – WTP and Pumphouse
Location
Dawson City, Yukon
Expertise
Electrical Instrumentation & Controls
Energy
Pump Stations
Water Treatment
Share
The Yukon government in their continuing effort to reduce their environmental footprint, are installing a solar photovoltaic system at the new Dawson City Water Treatment Plant Pumphouse.
Associated Engineering designed the new plant and provided solar design support to incorporate the new solar photovoltaic systems into the new building. We designed the control scheme for inverter power flow termination in the event of the back-up power generation system being activated, or fire alarm being activated.
The system is roof mounted on the upper Pumphouse roof and consists of 2 inverters, 72 optimizers and 72 solar photovoltaic panels, with further expansion capacity of another inverter. The system capacity is 25-28 kW depending on final panels available at time of installation and is expected to offset >21,000 kWH of energy annually. The system is in a high snowfall area and designed to maximise production of partially snow shaded photovoltaic panels, whilst also avoiding architectural shading.
In the plant, energy produced by the solar photovoltaic system is used to offset utility power requirements for plant loads. The project is expected to be completed in late-2019.
Project Highlights
More Electrical Instrumentation & Controls Projects
See all projects
Buildings
Chief Aranazhi School Upgrades
Electrical Instrumentation & Controls
La Ronge and Air Ronge Municipal Utilities Back-Up Power
Electrical Instrumentation & Controls
Bearspaw Water Treatment Plant Electrical Upgrades
Buildings
Simon Fraser University Parcel 21
Airports
Nanaimo Airport Airfield Electrical Upgrading
Water
Welland Water Treatment Plant
Building Mechanical
Scott Street Sewage Pumping Station Upgrades
Infrastructure
Livestock and Forage Centre of Excellence
Building Mechanical
Eiling Kramer Campground Park Service Centre
Building Mechanical
Oakmont Pump Station Upgrades
Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade
Building Mechanical
St. Albert Naki Transit Centre and Park & Ride
Building Mechanical
Centennial Arena Expansion
Buildings
Little Learners Academy
Energy