The Main and Central Substations are the largest that Associated Engineering has designed.
We provided civil, structural and building mechanical engineering expertise on six substation yards (Main, Central, South West, Ore Preparation Plant, Extraction & Tailings, and Co-Gen), and 10 skid substations (four Shovel Subs, two Hydro-transport Booster Subs, two Tailings Booster Subs, one Barge Sub, and one Out-of-Pit Tailings Area [OPTA] Sub). The facilities were designed to deliver 13.8 kV power, the utilization voltage, to various locations within the Fort Hills Facility.
Project Highlights
13.8 kV
power
More Building Structures Projects
See all projects
Buildings
Corix Biomass Energy Centre
Building Mechanical
St. Albert Naki Transit Centre and Park & Ride
Building Structures
Bone Yard Operations Centre Office Expansion
Buildings
Stoney Nakoda Child & Family Services Building Assessment
Building Mechanical
Elijah Smith School Energy Audit
Infrastructure
Tsawwassen First Nation Sewage Treatment Plant
Building Mechanical
Oakmont Pump Station Upgrades
Building Mechanical
Eiling Kramer Campground Park Service Centre
Buildings
Wood Innovation and Design Centre
Building Structures
Elkford Community Centre
Building Mechanical
Martensville Athletic Pavillion
Pump Stations
Skyline Pump Station
Pump Stations
Horseshoe Slough Drainage Pump Station
Buildings
Riel Recreation Park Redevelopment
Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
LEADERSHIP INSIGHTS
See all insights