Location
Fort McMurray, Alberta
Expertise
Building Structures
Electrical Instrumentation & Controls
Land Development
Share
The Main and Central Substations are the largest that Associated Engineering has designed.
We provided civil, structural and building mechanical engineering expertise on six substation yards (Main, Central, South West, Ore Preparation Plant, Extraction & Tailings, and Co-Gen), and 10 skid substations (four Shovel Subs, two Hydro-transport Booster Subs, two Tailings Booster Subs, one Barge Sub, and one Out-of-Pit Tailings Area [OPTA] Sub). The facilities were designed to deliver 13.8 kV power, the utilization voltage, to various locations within the Fort Hills Facility.
Project Highlights
13.8 kV
power
More Building Structures Projects
See all projects
Buildings
Corix Biomass Energy Centre
Building Structures
Oliver Bowen Light Rail Vehicle Storage and Maintenance Facility
Infrastructure
Livestock and Forage Centre of Excellence
Pump Stations
Skyline Pump Station
Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
Buildings
Wood Innovation and Design Centre
Pump Stations
12th Avenue Drainage Pump Station
Building Mechanical
Arbutus Water Treatment Plant
Buildings
Simon Fraser University Parcel 21
Buildings
Climate Change Risk Assessment for Buildings
Building Mechanical
Martensville Athletic Pavillion
Building Mechanical
Elijah Smith School Energy Audit
Building Structures
Broadview Drive Commercial Development
Building Mechanical
Centennial Arena Expansion
Water
Fort Chipewyan Water Treatment Plant Expansion
LEADERSHIP INSIGHTS
See all insights