Jim Pattison Centre of Excellence Building Technologies and Renewable Energy Conservation
Location
Penticton, British Columbia
Expertise
Building Mechanical
Energy
Sustainable Design
Building Structures
Share
Associated Environmental’s hydrogeology team developed the geothermal heating and cooling system for the project, including design and drilling of wells.
Other than a hardwood gymnasium floor sourced from Ontario, the project features 100 per cent B.C.wood, including pine from beetle‐kill affected forests in the Okanagan and FSC-certified lumber sourced from B.C.. The walls are built with composite panels, a combination of concrete and glulam (glued laminated timber) beams that are light and strong. These walls have heating and cooling piping inside with electrical conduits and ventilation built in. This is the first time this technology has been used in North America. All of the building’s mechanical and electrical services are exposed, where possible, to demonstrate the technology used. This is part of the building’s teaching and “living lab” capability
The eye-catching and energy‐efficient building earned the building the International Architecture Awards’ Green GOOD DESIGN Award from the prestigious European Centre for Architecture Art Design and Urban Studies, and The Chicago Athenaeum: Museum of Architecture and Design. The project also received the Tree for Life Award and the Award of Excellence from the Canadian Consulting Engineering Awards .
Client
Okanagan College
Awards
Canadian Consulting Engineering, Award of Excellence; Canadian Consulting Engineering, Tree for Life Award
Project Highlights
More Building Mechanical Projects
See all projects
Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade
Buildings
Simon Fraser University Parcel 21
Water
Fort Chipewyan Water Treatment Plant Expansion
Building Mechanical
Van Kam Freight Way Terminal
Building Mechanical
Hazardous Materials Survey and Abatement Monitoring
Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
Buildings
Misericordia Community Hospital Electrical Upgrades
Water
Jericho Reservoir
Building Mechanical
Centennial Arena Expansion
Building Mechanical
Eiling Kramer Campground Park Service Centre
Building Mechanical
St. Albert Naki Transit Centre and Park & Ride
Infrastructure
Rosehill Reservoir Rehabilitation
Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades
Energy
Minoru Aquatic Complex
Pump Stations
12th Avenue Drainage Pump Station
LEADERSHIP INSIGHTS
See all insights