Location
View Royal, British Columbia
Expertise
Building Mechanical
Building Structures
Pump Stations
Sustainable Design
Wastewater Collection & Storage
Share
Craigflower Pump Station is located west of Victoria, and serves Colwood, Langford, and View Royal. Associated Engineering completed option evaluation, conceptual design, detailed design, and provided construction services.
This architecturally pleasing and highly functional pump station features a self-cleaning trench style wet well, four 250 horsepower dry pit submersible pumps on variable frequency drives, and standby power generation.
Located near a residential neighbourhood, the pump station includes sound attenuation and a carbon media odour control unit. The design incorporates provisions for upgrading from Stage 1 flow requirements of 897 L/s to an ultimate capacity of 1991 L/s, as the service area continues to be developed.


Project Highlights
The pump station consists of a single-storey building (above-grade) with a significant below grade substructure. The below grade area, containing the wet well and pump room, extends below sea level and is located only a few metres from Portage Inlet. To deal with the challenging groundwater conditions and the constrained site, the station was constructed using a braced sheet pile retaining wall. The wet well is a compact self-cleaning trench-style configuration that can be divided into two areas using aluminum stop logs to safely permit operator entry, should maintenance be required.
In line with the Capital Regional District’s Regional Growth Strategy, the pump station includes sustainable design principles to provide the District with long-term value. A 1000 kW standby generator was included to ensure the station has back-up power in case of power failure. The standby generator provides enough power to operate three pumps and associated station loads. The fuel storage tanks provide 24 hours of storage at full load.
Due to the station’s close proximity to residences, the pump station systems were designed to comply with a night time maximum noise level of 40 dBA, except during power failure events, which requires the generator set to operate to provide backup power to the station.
More Building Mechanical Projects
See all projects

Pump Stations
12th Avenue Drainage Pump Station

Building Mechanical
Hazardous Materials Survey and Abatement Monitoring of Buildings

Buildings
Misericordia Community Hospital Electrical Upgrades

Infrastructure
Livestock and Forage Centre of Excellence

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Building Mechanical
St. Albert Naki Transit Centre and Park & Ride

Building Mechanical
Centennial Arena Expansion

Building Mechanical
Jim Pattison Centre of Excellence Building Technologies and Renewable Energy Conservation

Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade

Buildings
Chief Aranazhi School Upgrades

Building Mechanical
Athabasca Regional Service Centre, Administration Building

Building Mechanical
Powell River WWTP

Building Mechanical
Arbutus Water Treatment Plant

Building Mechanical
Eiling Kramer Campground Park Service Centre

Infrastructure