The City of Markham retained Associated Engineering to perform an HVAC condition assessment of the Main Yard Works Facility.
After the assessment was completed, we also complete a Feasibility Study to evaluate the financial and technical feasibility of installing a stand-by generator that would provide back-up power to the facility. This was motivated by the fact that the facility was without power for days following an ice storm in 2013. Without power, the facility was unable to fuel the City’s service vehicles, including its snow plow trucks, salters, and fire fighting trucks.


Project Highlights
At Associated, we believe we have a responsibility to understand the impacts of climate change, inform our clients about the risks to their infrastructure and communities, and assist them in developing infrastructure solutions that are both resilient and help mitigate the effects of climate change. The natural gas generator increases the resilience of this facility, and will allow the City to participate in the IESO’s Demand Response program, thus leading to operational savings.
After the feasibility study was completed, reviewed and discussed with the City, we were retained to provide detailed design and construction administration services for the installation of the new generator. A 250 kW Natural Gas Generator complete with sound enclosure and manual transfer switch (at the request of the City) was installed and commissioned.
More Building Mechanical Projects
See all projects

Buildings
Stoney Nakoda Child & Family Services Building Assessment

Building Mechanical
Eiling Kramer Campground Park Service Centre

Pump Stations
Skyline Pump Station

Building Mechanical
Van Kam Freight Way Terminal

Water
Fort Chipewyan Water Treatment Plant Expansion

Infrastructure
Pelham Patrol Yard Fuel Tank Replacement

Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade

Infrastructure
Tsawwassen First Nation Sewage Treatment Plant

Buildings
Misericordia Community Hospital Electrical Upgrades

Buildings
Climate Change Risk Assessment for Buildings

Water
Jericho Reservoir

Pump Stations
12th Avenue Drainage Pump Station

Buildings
Residuals Treatment Facility

Energy
Minoru Aquatic Complex

Building Mechanical