Location
Saanich, British Columbia
Expertise
Building Mechanical
Energy
Wastewater Collection & Storage
Wastewater Treatment / Water Resource Recovery
Share
Associated Engineering is a key team member on this Design-Build-Operate project for the Capital Regional District‘s Residuals Treatment Facility.
The facility will receive and stabilize the residuals (e.g. primary sludge and waste activated sludge) from the McLoughlin Point Wastewater Treatment Plant, a 108 million litres/day tertiary treatment plant. The Residuals Treatment Facility will also receive and stabilize hauled wastes from the region.
Associated Engineering is the design lead and together with the constructors, technology provider, and operator, is implementing a facility that will process various municipal sludges and cakes up to 3.7 million litres/day, including influent equalization (over 3,800 cubic metres), thickening (gravity belt thickeners), anaerobic digestion (three, over 7,000 cubic metre digesters), digested sludge storage (over 4,500 cubic metres), biogas storage (over 4,000 cubic metres), biogas conditioning, digested sludge dewatering (centrifuges), beneficial use of biogas, cake drying, and heat recovery.
Client
Capital Regional District
Project Highlights
The facility also includes an operations/administration building, water storage and fire pumping, as well as a sophisticated odour control system to handle the potential odours from the material.
Learn more about the Residuals Treatment Facility in this video (from 3:30 mark).
People on this project
More Building Mechanical Projects
See all projects
Building Mechanical
Hazardous Materials Survey and Abatement Monitoring
Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades
Building Mechanical
Craigflower Pump Station
Building Mechanical
Eiling Kramer Campground Park Service Centre
Infrastructure
Pelham Patrol Yard Fuel Tank Replacement
Building Mechanical
Elijah Smith School Energy Audit
Building Mechanical
Oakmont Pump Station Upgrades
Energy
Minoru Aquatic Complex
Infrastructure
Livestock and Forage Centre of Excellence
Water
Fort Chipewyan Water Treatment Plant Expansion
Buildings
Chief Aranazhi School Upgrades
Buildings
Misericordia Community Hospital Electrical Upgrades
Airports
Calgary Airport Glycol Treatment Facility
Building Mechanical
Scott Street Sewage Pumping Station Upgrades
Building Mechanical
Jim Pattison Centre of Excellence Building Technologies and Renewable Energy Conservation
LEADERSHIP INSIGHTS
See all insights