Location
Welland, Ontario
Expertise
Water
Water Treatment
Water Supply, Storage, & Distribution
Electrical Instrumentation & Controls
Pump Stations
Share
The proposed Phase 1 and Phase 2 upgrades at Welland Water Treatment Plant are critically important initiatives to ensure a reliable and affordable water supply into the future for the Region of Niagara, including the City of Welland, the Town of Pelham, and the City of Thorold.
Associated Engineering was engaged by the Region to provide the following services related to the Phase 1 upgrades:
- Preliminary Design
- Detailed Design
- Tendering
- Contract Administration
- SCADA system programming and Integration
- Construction Inspection
- Warranty Period Services
Project Highlights
The major components of this assignment include upgrades in the following areas:
- Disinfection (UV System and Chlorination)
- High Lift Pump Station
- Treated Water Storage Reservoir
- Distribution Watermains
- Electrical
- Demolition of Existing Buildings (Plant 2)
- Demolition of Existing Treated Water Storage Reservoir
More Water Projects
See all projects
Pump Stations
12th Avenue Drainage Pump Station
Buildings
Belle River Water Treatment Plant
Wastewater Treatment / Water Resource Recovery
Denare Beach Wastewater Treatment Plant Upgrades
Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement
Environmental
Big Bend Master Drainage Plan
Infrastructure
Gitwinksihlkw Water Treatment Plant
Infrastructure
Rosehill Reservoir Rehabilitation
Building Mechanical
Powell River WWTP
Energy
Solar Feasibility Study for Medicine Hat Reservoirs
Water
Source Watershed Assessment
Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade
Water
Japan Gulch Ultraviolet Disinfection Facility
Water
Pitt River Inter-Tidal Habitat
Pump Stations
Avenue H Reservoir and Pump Station
Infrastructure
Kluskus Village Domestic Water System Improvements
LEADERSHIP INSIGHTS
See all insights