The City of Hamilton retained Associated Engineering to undertake an emergency repair of the 151 Pedestrian Bridge.
The original structure had been subjected to severe chloride damage as the pedestrian walkway is salted during the winter months. Upon investigation of the structure, we found the floor system particularly at the structure ends had reached end of life and posed an operational hazard to the structure.
Associated Engineering took specific measurements and undertook a detailed analysis of the structure and determined remedial work was required to maintain operation of the structure. The expedient repair was installed and allowed the structure to remain open until its scheduled replacement.


Project Highlights
More Transportation Projects
See all projects

Airports
Vancouver International Airport Parallel Runway

Infrastructure
Baxter Bridge Rehabilitation

Transportation
Pitt River Bridge

Transportation
Overlea Blvd. Bridge Rehabilitation

Transportation
Don River Blvd. Bridge Rehabilitation

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Transportation
Still Creek Pedestrian Bridge Replacement

Land Development
Royal Bay Subdivision

Transportation
John Hextall Bridge Rehabilitation

Transportation
Pioneer Pedestrian Bridge

Transportation
Casino Mine Access Road

Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways

Transportation
Kitsault Mine Access Road and Bridge Assessments
LEADERSHIP INSIGHTS
See all insights