Location
Peace River, British Columbia
Expertise
Environmental Assessment
Fish, Wildlife & Ecosystems
Share
A mining company was proposing to construct a metallurgical coal mine at its Carbon Creek site in northern British Columbia’s Peace River Coal Fields.
To support the submission of an Environmental Assessment Certificate (EAC) application, Associated Environmental completed the terrestrial baseline assessments, including the ecosystem, vegetation and wildlife studies, and Reclamation Plan for the study area.
To characterize ecosystems, extensive ground investigations were conducted to provide a comprehensive vegetation inventory, soil profiles, and identification of rare plants and plant communities. This resulted in Terrestrial Ecosystem Mapping of the 630 square kilolmetre local study area, and Predictive Ecosystem Mapping of the 15,500 square kilometre regional study area.


Project Highlights
Wildlife studies were conducted for a range of taxa groups and their habitats. B.C. survey protocols (Resource Information Standards Committee) were used to inventory breeding birds, owls and amphibians potentially occurring in the study area. Habitat assessments were completed for ungulates and furbearers, and winter tracking surveys helped to identify relative use and movement corridors.
The results of these baseline programs will support the preparation of an Environmental Assessment report and reclamation planning for the proposed mine.
More Environmental Assessment Projects
See all projects

Containment Systems
Asquith Landfill Decomissioning

Environmental Assessment
Homer Watson Boulevard Widening & Corridor Study

Environmental
Environmental Assessments, Southeast BC

Environmental
Great Slave Lake Nutrient Risk Assessment and Treatment Improvement Options Study Fiddlers Lagoon Wastewater Treatment

Active Transportation
Okanagan Rail Corridor Ballast Testing and ESA Reviews

Environmental Assessment
Phase I Environmental Site Assessment

Environmental Assessment
Environmental Assessment of Westside Road

Environmental Assessment
Fischer-Hallman Road Environmental Assessment

Environmental Assessment
Liquid Waste Management Plan Environmental Impact Study

Environmental Assessment
Hawrelak Lake Algae Remediation – Phase 1 Feasibility Study

Environmental
37 Street SW Storm Trunk Relocation

Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound

Containment Systems
Main Street Historical Landfill Excavation

Airports
Calgary Airport Trail Tunnel, Assessment and Permitting

Transportation