Location
Lethbridge, Alberta
Expertise
Share
Associated Engineering has helped the City of Lethbridge join the ranks of other major Canadian cities by providing detailed design, community engagement and construction services for the City’s first bike boulevard on the beautiful and historic 7 Avenue S from 4 St S to Mayor Magrath Drive through the neighbourhoods of London Road and Victoria Park.
A bike boulevard is a roadway that has been modified to make cycling more comfortable and safer.
7 Avenue S now provides cyclists with a viable and safe route for east-west travel through the City. The west end of the corridor connects to the City’s regional pathway and the east end connects to a 4.8 km north-south separated multi-use pathway along Mayor Magrath Drive as well as Henderson Lake, the new swimming pool, Spitz Stadium and the SLP Skatepark.

Client
City of Lethbridge

Project Highlights
More Transportation Projects
See all projects

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study

Transportation
Edmonton Valley Line – Stage 1

Transportation
Yorkton Cycling Network

Bridges
Granville Bridge Seismic Retrofit and Renewal

Transportation
Port Mann Highway 1 Improvements Highway, Structural and Drainage Engineering

Infrastructure
Yoho Bridge Concrete Design

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Bridges
Rossdale Bridge Rehabilitation

Transportation
Calgary Airport Runway and Tunnel

Transportation
Regina Bypass ITS Infrastructure

Transportation
Ironworkers Memorial Second Narrows Bridge Fatigue Study

Transit
SkyTrain Crossing of South Point Drive

Transportation
Still Creek Pedestrian Bridge Replacement

Transportation
Bobtail Forest Service Road Overpass

Transportation
Kapuskasing River Bridge
LEADERSHIP INSIGHTS
See all insights











