The BC Ministry of Transportation and Infrastructure retained Associated Engineering to undertake a condition survey, seismic assessment, and renewal life-cycle analysis to determine the future treatment of the Agassiz-Rosedale Bridge.
Constructed in 1956, it carries two lanes of the Agassiz-Rosedale Highway (Highway 9) over the Fraser River between Agassiz and Rosedale, BC. The 1.87 km long structure has 86 concrete/steel composite girder approach spans and 6 truss spans over the main river. It has a number of unique structural elements and systems along its length that presented challenges and opportunities to extend its economic life.
Client
BC Ministry of Transportation and Infrastructure
Project Highlights
1.87km
Length
86
concrete/steel composite girder
6
truss
Associated Engineering with sub-consultants performed a detailed close-proximity inspection of all spans, a detailed deck inspection and condition survey, a coatings evaluation, a seismic assessment and retrofit strategy, a soils investigation, and developed a range of options to rehabilitate and improve the safety and future function of the bridge. Cost estimates for the various upgrading and future maintenance scenarios were developed, complete with life-cycle costing, cash flows, and risk scenarios.
Based on our investigations and option development, we presented a “renewal options” report complete with clear recommendations on works and timing to maintain and improve this critical bridge for several decades into the future.
More Bridges Projects
See all projects
Transportation
Pitt River Bridge
Bridges
Rossdale Bridge Rehabilitation
Asset Management
Sea to Sky Highway – Bridge Structural Engineering Services
Bridges
Beaverdams Road and Power Canal Bridges
Bridges
Westshore Terminals Overpass
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Transportation
Haisla Bridge Replacement
Bridges
Close Proximity Bridge Inspections – Chilliwack Forest District and Chinnok BCTS Business Area
Transportation
170th Street Pedestrian Bridge
Transportation
St. Andrews Lock and Dam Bridge Deck Replacement
Asset Management
Canmore Bridge Management
Bridges
Sucker River Bridge Replacement
Pedestrian Bridges
Hangingstone River Pedestrian Bridge
Bridges
Camrose Creek Bridge Replacement
Transportation