The Government of the Northwest Territories retained Associated Engineering to evaluate the existing condition, load rate, and prepare life-cycle cost estimates for retrofit and replacement options for the Frank Channel and Kakisa River Bridges.
Both bridges are critical elements of the highway network in the Northwest Territories.
Associated Engineering conducted a close proximity inspection of both structures using a specialized inspection truck. Prior to conducting the inspections, a 3-D finite element model was created to evaluate the load rating based on CAN/CAS-S6-00 and identify any members that may be over-stressed or subject to high fatigue cycles. This work was then used to optimize the ultrasonic integrity inspections of the truss members.
We prepared a report that provided a Life Cycle Cost summary of the retrofit and replacement options, including total costs to 2053, salvage value, and expected residual life.
Client
The Government of the Northwest Territories
Project Highlights
More Bridges Projects
See all projects
Bridges
Camrose Creek Bridge Replacement
Infrastructure
Baxter Bridge Rehabilitation
Transportation
Medicine Hat Boardwalk Replacements
Bridges
Nass River Bridge Replacement
Bridges
Fifth Bridge Replacement
Pedestrian Bridges
Hangingstone River Pedestrian Bridge
Transportation
Still Creek Pedestrian Bridge Replacement
Bridges
Ross River Pedestrian Bridge Rehabilitation
Bridges
Rossdale Bridge Rehabilitation
Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
Bridges
Deh Cho Bridge, Quality Management Services
Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Bridges
Willingdon Avenue Overpass Seismic Retrofit
Bridges
La Biche River Bridge – Highway 63
Bridges