Ministry of Highways and Infrastructure – Government of Saskatchewan retained Associated Engineering to analyze the Outlook Truss Bridge, perform a condition assessment and investigate rehabilitation options to provide a limited extension of the service life by 15-20 years.
If feasible, the bridge would be used for recreational traffic including snowmobiles, ATVs, pedestrians, bicycles and horses.
The bridge was built in 1936 as the primary crossing of the South Saskatchewan River on Highway 15. It is a six-span crossing, 347.7 metre long, consisting of five steel Pratt through truss spans and one steel I beam span. The bridge was decommissioned in 1998 after construction of a new bridge adjacent to the existing bridge was completed.
Client
Ministry of Highways and Infrastructure – Government of Saskatchewan
Project Highlights
347.7m
length
We performed a detailed investigation of the bridge in order to confirm the general arrangement of the bridge, assess the general condition of the members, verify the loads and load paths of the structure, and identify other aspects that may affect the load capacity. Overall, the Outlook Truss Bridge was in poor condition mainly due to extensive deterioration of the concrete deck.
More Bridges Projects
See all projects
Infrastructure
Churchill Airport Runway Upgrades
Transportation
Overlea Blvd. Bridge Rehabilitation
Bridges
West Main Street Bridge Restoration
Bridges
Fifth Bridge Replacement
Bridges
Coast Meridian Bridge
Asset Management
Canmore Bridge Management
Bridges
SkyTrain Grandview Cut Structural Upgrade
Bridges
Rossdale Bridge Rehabilitation
Transportation
184 Street and Yellowhead Trail Interchange
Transportation
Ray Gibbon Drive Twinning
Bridges
Nass River Bridge Replacement
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Asset Management
Sea to Sky Highway – Bridge Structural Engineering Services
Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment
Bridges