Associated Engineering completed the design and provided construction administration services for Cell 3 East at the Halton Waste Management Site.
We assembled a project team that provided the Regional Municipality of Halton with the benefits of our unparalleled understanding of the Halton Waste Management Site.
The Cell 3 East project included:
- Preliminary and detailed design of the sub-liner, re-compacted clay liner and leachate collections system. Design of permanent and semi-permanent litter fencing was completed. A design for a air/watertight manhole lid was completed and existing manhole lids were removed and replaced with the new lid.
- Preparation of a Schedule of Quantities and Construction Cost Estimate.
- Preparation of contract documentation and assisted the Region during the tendering period.
- Provided contract administration and inspection site services
- Provided innovative and cost-conscious design improvements, and kept the design philosophy of the site intact.
- Carefully reviewed all the hydrogeological data and determined landfill base elevations that achieved the design requirements.
- Developed a detailed liner testing protocol to ensure the re-compacted clay liner was constructed to meet stringent permeability requirements.
![Map Image](https://www.ae.ca/wp-content/themes/ae/images/maps/Ontario.png)
![Blue Section](https://www.ae.ca/wp-content/themes/ae/images/blue_section.png)
Project Highlights
More Containment Systems Projects
See all projects
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/oakville-fourth-line-closed-landfill-tn.jpg)
Infrastructure
Oakville Fourth Line Closed Landfill
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/cattle-tn.jpg)
Containment Systems
Literature/Technology review services
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/IMG_0788.jpg)
Infrastructure
Glenmore Landfill Entrance
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/asquith-landfill-decommissioning-tn.jpg)
Containment Systems
Asquith Landfill Decomissioning
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/brine-pond-construction-tn.jpg)
Containment Systems
Brine Pond Construction
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/mainstreet-tn.jpg)
Containment Systems
Main Street Historical Landfill Excavation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/silverberry-secure-landfill-4.jpg)
Containment Systems
Silverberry Secure Landfill
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/proj_livingston_2.jpg)
Climate Change Adaptation & Mitigation
Livingston Trail Environmental Control Facility
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/lumsden-landfill_2.jpg)
Environmental
Phase II Environmental Assessment for 5 Year Permit to Operate, Lumsden Landfill
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/kennedale-snow-tn.jpg)
Infrastructure
Kennedale Snow Storage Site Development
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/YYC-Glycol.jpg)
Airports
Calgary Airport Glycol Treatment Facility
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/irrigation-sustainability-tn.jpg)
Infrastructure