Location
Edmonton, Alberta
Expertise
Hydrotechnical
Share
As part of Edmonton’s City-Wide Flood Protection Mitigation Assessment, AE created and modelled the storm and sanitary components of approximately 8,800 ha of residential developments located in North Edmonton.
The model contained approximately 115,000 links (representing 3,000 km) including overland flow channels, storm, sanitary and combined pipes, ditches, culverts, natural watercourses, and catch basin leads.
Associated Engineering (AE) conducted a dual drainage study of the major and minor storm and sanitary system using a 1D-1D and a 1D 2D computer model to determine flood hazard areas, corresponding cost of flood damages, and design system upgrades to prevent future flooding.
![Map Image](https://www.ae.ca/wp-content/themes/ae/images/maps/Alberta.png)
![Blue Section](https://www.ae.ca/wp-content/themes/ae/images/blue_section.png)
Project Highlights
8,800ha
residential developments
115,000
links
80,000
nodes
14,000
catchments
Approximately 80,000 nodes were modelled consisting of storm, sanitary, and combined manholes, overland flow nodes, and catch basins. Additionally, about 14,000 catchments were delineated at a catch basin scale. The overland flow component was connected to the minor system and modelled in 2D using Mike-21. The improvement options were assessed using the City’s Level of Service (LOS) criteria based on using Hydraulic Condition Ratings and LOS objectives. Improvements to the system included upgrades to storage and conveyance systems supplemented by Low Impact Development techniques.
AE used proprietary topographical analysis and techniques in GIS to delineate the catchments to aid in building the large scale hydraulic model.
More Hydrotechnical Projects
See all projects
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/mill_creek_thumb.jpg)
Water
Mill Creek Erosion Study
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/elbow_river_thumb.jpg)
Hydrotechnical
Elbow River 2D Flood Modelling
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/yorkton_drainage_thumb.jpg)
Hydrotechnical
Yorkton West Storm Drainage Study
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/IMG_2322.jpg)
Environmental
Port of Vancouver – Climate Change Adaptation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/big-bend-tn.jpg)
Environmental
Big Bend Master Drainage Plan
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/medicine-hat-flood-assistance-tn.jpg)
Hydrotechnical
Medicine Hat Flood Assistance
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/surrey_climate_thumb.jpg)
Hydrotechnical
Climate Change Rainfall Adaptation Strategy
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/emergency-flood-damage-reduction-program-tn.jpg)
Climate Change Adaptation & Mitigation
Emergency Flood Damage Reduction Program
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/port_colborne_thumb.jpg)
Environmental Assessment
Storm Sewer System Infrastructure Needs Study
LEADERSHIP INSIGHTS
See all insights