Location
Regina, Saskatchewan
Expertise
Climate Change Adaptation & Mitigation
Hydrotechnical
Infrastructure
Share
Associated Engineering was contracted to provide engineering services for the Emergency Flood Damage Reduction Program.
Due to high amounts of rain through May, June and July properties and communities were in risk of flooding. Emergency drainage improvements were designed and implemented, along with long term solutions in some instances.
Associated Engineering was requested to provide technical assistance and site inspections for the nine separate locations. Reports were prepared for the Water Security Agency to outline emergency flood relief measures and site investigations including major construction. These mitigation measures were needed immediately, and could be altered to be long term.


Project Highlights
More Climate Change Adaptation & Mitigation Projects
See all projects

Climate Change Adaptation & Mitigation
Highway 40 Emergency Flood Reconstruction

Climate Change Adaptation & Mitigation
Calgary Zoo Flood Mitigation

Climate Change Adaptation & Mitigation
Toronto Water Quality Master Plan

Climate Change Adaptation & Mitigation
Nanaimo Reservoir No. 1 and Energy Recovery Facility

Environmental
Growth and Economic Development Strategy

Transportation
Pitt River Bridge

Climate Change Adaptation & Mitigation
Climate Change Adaptation Scenario Development and Vulnerability and Risk Assessment

Environmental
Climate Change Risk Assessment

Climate Change Adaptation & Mitigation
RISC Hydrometric Standards Review

Environmental
Okanagan Valley Drought Planning

Climate Change Adaptation & Mitigation
Fraser River Foreshore – Reach 9 Dyke

Environmental
Big Bend Master Drainage Plan

Buildings
Climate Change Risk Assessment for Buildings

Environmental
John Matthews Creek Ravine Management Strategy and Creek Restoration

Climate Change Adaptation & Mitigation