Location
Saskatoon, Saskatchewan
Expertise
Building Structures
Landscape Architecture
Parks & Recreation
Share
The PotashCorp Playland at Kinsmen Park was completed in 2015. The existing park was significantly renovated, with the addition of a large number of attractions.
Associated Engineering performed full structural engineering design, detailing and construction administration services on the train station structure, concession stand building, as well as the concrete piled foundations for the ferris wheel and carousel.
The train station is a highly architectural structure comprising an exposed cross-laminated timber roof supported on architectural concrete columns and cladded wood-framed “fin” walls. Complex yet discreet steel connections were required in order to support the long spans of the cross-laminated timber roof structure. There is a glazed clerestory, and the swing gates and sliding doors around the perimeter can be opened or closed depending on the season. The station canopy structure and the waiting platform are supported on a concrete piled foundation.


Project Highlights
People on this project
More Building Structures Projects
See all projects

Building Mechanical
Arbutus Water Treatment Plant

Buildings
Wood Innovation and Design Centre

Infrastructure
Gitwinksihlkw Water Treatment Plant

Buildings
Climate Change Risk Assessment for Buildings

Pump Stations
Horseshoe Slough Drainage Pump Station

Water Treatment
Russell Binscarth Water Treatment Plant

Buildings
Manitoba Hydro – Keeyask Camp

Buildings
Corix Biomass Energy Centre

Building Mechanical
Eiling Kramer Campground Park Service Centre

Building Structures
Columbia Street Pump Station

Building Mechanical
Martensville Athletic Pavillion

Buildings
Stoney Nakoda Child & Family Services Building Assessment

Buildings
Heron Hall

Building Mechanical
Centennial Arena Expansion

Building Structures
Broadview Drive Commercial Development
LEADERSHIP INSIGHTS
See all insights