Location
Powell River, British Columbia
Expertise
Building Mechanical
Irrigation
Wastewater Collection & Storage
Wastewater Treatment / Water Resource Recovery
Water
Share
The City of Powell River’s Liquid Waste Management Plan (LWMP) established the need to replace three compliance-ridden wastewater treatment facilities with a new treatment facility
Associated Engineering was retained to design the new Consolidated Wastewater Treatment Plant (CWWTP).
Although the public recognized that a state-of-the-art treatment system would safeguard human health and the marine environment, some residents were alarmed that the new facility would be located in their neighbourhood.
Public engagement made it clear that the design needed to minimize the impact of the new facility on the community and integrate the facility to the natural environment.
Associated Engineering’s design met these objectives in the following ways:
- Integrating the facility into the natural environment, and preserving existing heritage trees and the network of trails in the undeveloped waterfront lands.
- Minimizing the facility footprint and using green roofs on buildings/structures to soften the “industrial” look.
- Containing potential sources of odour and providing state-of-the-art odour treatment


Project Highlights
An attractive process building contains the headworks (screening, degritting), sludge thickening and biosolids dewatering. Biological treatment is a compact, modular, activated sludge system with a step feed system for wet weather. A common-wall integrated bioreactor complex contains four modular bioreactors / integrated secondary clarifiers, two aerobic digesters, and ultraviolet effluent disinfection in the central gallery housing process equipment and piping. An advanced three-stage odour control system will treat all of the potentially foul air from the process building.
People on this project
More Building Mechanical Projects
See all projects

Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs

Building Mechanical
Jim Pattison Centre of Excellence Building Technologies and Renewable Energy Conservation

Building Mechanical
St. Albert Naki Transit Centre and Park & Ride

Water
Jericho Reservoir

Infrastructure
Rosehill Reservoir Rehabilitation

Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study

Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades

Building Mechanical
Arbutus Water Treatment Plant

Building Mechanical
Yard Works Facility Emergency Backup Generator

Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade

Infrastructure
Livestock and Forage Centre of Excellence

Pump Stations
12th Avenue Drainage Pump Station

Building Mechanical
Scott Street Sewage Pumping Station Upgrades

Building Mechanical
Craigflower Pump Station

Infrastructure