Location
Leduc, Alberta
Expertise
Building Mechanical
Electrical Instrumentation & Controls
Share
Associated Engineering provided the detailed electrical design including intelligent lighting, security, telecom, network, and power for a new 745 square metre office and a Group F, Division 2, three bay maintenance complex.
Associated Engineering’s scope of work included both the interior and exterior lighting designs, including power and communication systems, all while coordinating with the architects, who designed the building.
The electrical designs included:
- Capacity for the future installation of a backup generator
- Two electrical panels. One panel feeds most of the non-critical loads. The other panel feeds the few critical loads
- If they choose to install a backup generator, then only the critical load panel will need to be energized by the generator via an automated by-pass or transfer switch
![Map Image](https://www.ae.ca/wp-content/themes/ae/images/maps/Alberta.png)
![Blue Section](https://www.ae.ca/wp-content/themes/ae/images/blue_section.png)
Project Highlights
745M2
office
The critical loads of this building are:
- All the of duplex receptacles at the perimeter of the multi-purpose room (the multi-purpose room becomes the Emergency Operation Centre).
- Power in Room 102 (Clerk area)
- Power in IT Room
- Several ceiling lights throughout office area, especially the multi-purpose room; preferred LED lights
- Office area and some of the shop heating system
- Several receptacles within the shop bay areas
- Security system and the motorized gates
More Building Mechanical Projects
See all projects
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/woodward-wwtp-headworks-biofilter-upgrades-tn.jpg)
Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/thumb8df5a8391b316d6b9fc9ff00001037d2.jpg)
Building Mechanical
Eiling Kramer Campground Park Service Centre
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/fort-chipewyan-wtp-tn-1.jpg)
Water
Fort Chipewyan Water Treatment Plant Expansion
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/north-wall-sewage-treatment-plant-and-main-lift-station-upgrade-tn.jpg)
Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/elijah-smith-school-energy-audit-tn.jpg)
Building Mechanical
Elijah Smith School Energy Audit
![Project Image](https://www.ae.ca/wp-content/uploads/2023/09/20230508_142331.jpg)
Building Mechanical
Powell River WWTP
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/capital-regional-district-residuals-thumb.jpg)
Building Mechanical
Residuals Treatment Facility
![Project Image](https://www.ae.ca/wp-content/uploads/2023/08/NIX2284-copy.jpg)
Pump Stations
Skyline Pump Station
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/img_chiefaranazhischool_20220627_143446-thumb.jpg)
Buildings
Chief Aranazhi School Upgrades
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/arbutus-wtp-tn.jpg)
Building Mechanical
Arbutus Water Treatment Plant
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/scott-street-pump-station-tn.jpg)
Building Mechanical
Scott Street Sewage Pumping Station Upgrades
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/centennial-arena-expansion-tn.jpg)
Building Mechanical
Centennial Arena Expansion
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/van-kam-tn.jpg)
Building Mechanical
Van Kam Freight Way Terminal
![Project Image](https://www.ae.ca/wp-content/uploads/2023/09/IMG_6882.jpg)
Water
Jericho Reservoir
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/pelham-patrol-yard-tn.jpg)
Infrastructure