Location
Kelowna, British Columbia
Expertise
Share
The Skyline Pump Station at the intersection of Clifton and High Road in Kelowna, BC needed upgrades.
The city wanted to bring the electrical and mechanical control rooms above ground. The project required AE to strengthen the existing concrete substructure to allow construction of a new above-ground building. Associated’d multi-discipline team then designed a new structure, including the building mechanical, structural, and electrical engineering components, to house the pump station’s control rooms.

Client
City of Kelowna

Project Highlights
More Pump Stations Projects
See all projects

Pump Stations
Horseshoe Slough Drainage Pump Station

Buildings
Riel Recreation Park Redevelopment

Pump Stations
Faulkner Lift Station

Infrastructure
Forest Lawn Lift Station

Pump Stations
Oakville Water Purification Plant

Infrastructure
Oakville Fourth Line Closed Landfill

Building Mechanical
Arbutus Water Treatment Plant

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Building Mechanical
Craigflower Pump Station

Pump Stations
Homer Watson Pump Station Upgrade

Computational Fluid Dynamics Analysis
Saskatoon Raw Water Intake & Pump Station

Environmental Engineering
Regina Hauled Waste Receiving Station

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Water
Welland Water Treatment Plant

Building Structures