Location
Welland, Ontario
Expertise
Water
Water Treatment
Water Supply, Storage, & Distribution
Electrical Instrumentation & Controls
Pump Stations
Electrical Instrumentation & Controls
Share
The proposed Phase 1 and Phase 2 upgrades at Welland Water Treatment Plant are critically important initiatives to ensure a reliable and affordable water supply into the future for the Region of Niagara, including the City of Welland, the Town of Pelham, and the City of Thorold.
Associated Engineering was engaged by the Region to provide the following services related to the Phase 1 upgrades:
- Preliminary Design
- Detailed Design
- Tendering
- Contract Administration
- SCADA system programming and Integration
- Construction Inspection
- Warranty Period Services
![Map Image](https://www.ae.ca/wp-content/themes/ae/images/maps/Ontario.png)
![Blue Section](https://www.ae.ca/wp-content/themes/ae/images/blue_section.png)
Project Highlights
The major components of this assignment include upgrades in the following areas:
- Disinfection (UV System and Chlorination)
- High Lift Pump Station
- Treated Water Storage Reservoir
- Distribution Watermains
- Electrical
- Demolition of Existing Buildings (Plant 2)
- Demolition of Existing Treated Water Storage Reservoir
More Water Projects
See all projects
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/regina-lift-station-tn.jpg)
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
![Project Image](https://www.ae.ca/wp-content/uploads/2023/05/kluskus-wtp-ceremony.jpg)
Infrastructure
Kluskus Village Domestic Water System Improvements
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/Pitt-River-Inter-Tidal-Habitat-tn.jpg)
Water
Pitt River Inter-Tidal Habitat
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/fort-chipewyan-wtp-tn-1.jpg)
Water
Fort Chipewyan Water Treatment Plant Expansion
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/big-bend-tn.jpg)
Environmental
Big Bend Master Drainage Plan
![Project Image](https://www.ae.ca/wp-content/uploads/2023/09/IMG_6882.jpg)
Water
Jericho Reservoir
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/japan_gulch_2.jpg)
Water
Japan Gulch Ultraviolet Disinfection Facility
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/AE-Gitwinksihlkw-Water-Treatment-Plant_004.jpg)
Infrastructure
Gitwinksihlkw Water Treatment Plant
![Project Image](https://www.ae.ca/wp-content/uploads/2023/04/melville-water-treatment-plant-thumbnail.jpg)
Infrastructure
Melville Water Treatment Plant
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/Russell-WTP-10.jpg)
Water Treatment
Russell Binscarth Water Treatment Plant
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/belle-river-wtp-tn.jpg)
Buildings
Belle River Water Treatment Plant
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/mill_creek_thumb.jpg)
Water
Mill Creek Erosion Study
![Project Image](https://www.ae.ca/wp-content/uploads/2024/06/ft-mac-wwtp-eic-tn.jpg)
Energy
Fort McMurray Wastewater Treatment Plant – Instrumentation, Controls & Automation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/denare-beach-wastewater-treatment-plant-1-1.jpg)
Wastewater Treatment / Water Resource Recovery
Denare Beach Wastewater Treatment Plant Upgrades
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/source-watershed-assessment-tn.jpg)
Water
Source Watershed Assessment
LEADERSHIP INSIGHTS
See all insights