Location
EDMONTON, Alberta
Expertise
Infrastructure
Water
Pipelines
Structures
Share
After discovering several major issues at Trestle No. 3, EPCOR retained Associated Engineering to rehabilitate and replace the corroded steel pipe and fix erosion issues impacting the ground around the trestle.
The project team worked together to implement a series of innovative designs and construction methodologies to overcome the challenges posed by lack of access and the steep ravine slopes. Risks during construction were managed by using alternative construction methodologies allowing workers to safely traverse the steep slopes and provide protection from falling debris.

Client
EPCOR
Completion
2022
Awards
Consulting Engineering Alberta, Award of Merit

Project Highlights
1964
originally constructed
72m
length
23m
max height
900mm
steel pipe diameter
People on this project
More Infrastructure Projects
See all projects

Building Structures
Broadview Drive Commercial Development

Environmental Assessment
Fischer-Hallman Road Environmental Assessment

Transportation
Still Creek Pedestrian Bridge Replacement

Infrastructure
Wildfire Infrastructure Rehabilitation Program

Downtown and Main Street Revitalization
West Rossdale Redevelopment

Environmental
Tlichǫ Cultural Commons Digital Database

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Transportation
Canmore Bridge Management

Environmental
Drinking Water System Improvements in Quaaout Community

Infrastructure
Gold Bar Wastewater Treatment Plant

Infrastructure
Century Park

Transportation
Granville Bridge Seismic Retrofit and Renewal

Containment Systems
Asquith Landfill Decomissioning

Environmental
Splatsin Eagle River Compensation Site Identification Site

Airports
Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements
LEADERSHIP INSIGHTS
See all insights