Location
Outlook, Saskatchewan
Expertise
Infrastructure
Irrigation
Water Supply, Storage, & Distribution
Share
The Water Security Agency engaged Associated Engineering to prepare a design and tender package for the required upgrades to the first 3.2 kilometres of canal in the Saskatoon South East Water Supply System, immediately east of the Broderick Reservoir.
The rehabilitation design of the canal was completed using a fast-tracked, modified progressive delivery approach, in collaboration with Agenct representatives, to meet the extremely short timeline from design initiation to tender ready. The design includes a capacity upgrade of approximately 30% to 8.2 cubic metres per second, incorporation of a geotextile liner and rock armour, turn-out, cross drain, and drain inlet replacements, and modifications to check structures.
Project Highlights
More Infrastructure Projects
See all projects
Streetscaping
Vanalman Avenue Upgrades
Airports
Inuvik Airport Runway Extension and Airside Civil Infrastructure Improvements
Environmental
Phase I Environmental Site Assessment of 10 Housing Units
Transportation
Glenmore Dam Utility Relocation
Infrastructure
Mooney Forest Service Road
Environmental
Sicamous to Armstrong Rail Trail Agricultural Component
Bridges
Moody Street Overpass
Environmental
Splatsin Eagle River Compensation Site Identification Site
Active Transportation
Highway 1 at Mountain Highway Interchange
Water
Fort Chipewyan Water Treatment Plant Expansion
Infrastructure
Buffalo Creek Culvert Replacement
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Transportation
Highway 17 at County Road 508 Interchange
Parks & Recreation
Pexsisen Elementary School
Infrastructure
Lakeshore Drive Redevelopment
LEADERSHIP INSIGHTS
See all insights