Location
Delta, British Columbia
Expertise
Bridges
Container & Intermodal Facilities
Structures
Share
Faced with progressive deterioration of their 40-year-old, single-lane Bailey bridge, Westshore Terminals retained Associated Engineering to design its modern replacement.
Working closely with a geotechnical consultant, Associated Engineering’s designers determined that the most economical approach to bridging on the marine fill site was a series of lightweight simple spans on single-column piers and low-bearing pressure footings, occupying the same footprint as the existing bridge. Four 30 metre spans were selected to cross the two rail tracks and access roads, with the earthfill approaches retained with mechanically stabilized earth walls. The selected scheme was chosen for its ability to accommodate future predicted ground deformations.
A major consideration was accommodating the 1 in 2475-year earthquake ground motions for the Class F marine-fill site. Drawing on its experience with cost-effective design of base-isolated bridges, Associated Engineering was able to solve this stringent design challenge by installing ‘link decks’ between the spans to create a continuous deck diaphragm and ‘tuning’ the isolators to suit the flexibility of each individual substructure component. The isolators selected are simple elastomeric bearings vulcanized to plates bolted to both superstructure and substructure.


Project Highlights
All details were carefully selected for use by industrial traffic, including off-road vehicles and to avoid the accumulation of coal dust, which is prevalent at Westshore’s busy coal terminal. With trains occupying the rail tracks most of the time, track occupations for removal of the Bailey Bridge and erection of the new superstructure are limited. As a result, the new superstructure comprises steel plate girders and full-depth precast deck panels to speed installation and limit field work. Durability is enhanced by designing-in protection from deck run-off for components beneath the expansion joints at each abutment.
Construction occurred in the summer of 2017 to minimize site occupation and the resulting impact on coal terminal operations. The new structure provides two-lane operation and full load capacity.
More Bridges Projects
See all projects

Transportation
Canmore Bridge Management

Transportation
Kitsault Mine Access Road and Bridge Assessments

Bridges
Agnico Eagle Heavy Haul Bridges

Bridges
SkyTrain Grandview Cut Structural Upgrade

Bridges
Muskeg River Bridge

Bridges
Fifth Bridge Replacement

Transportation
Miette Hot Springs Culvert and Bridge Replacement

Transportation
Overlea Blvd. Bridge Rehabilitation

Transportation
Granville Bridge Seismic Retrofit and Renewal

Transit
SkyTrain Crossing of South Point Drive

Bridges
Camrose Creek Bridge Replacement

Bridges
Frank Channel and Kakisa River Bridge Assessment

Active Transportation
Highway 1 at Mountain Highway Interchange

Bridges
Burrard Bridge Rehabilitation

Transportation
Coast Meridian Overpass Detailed Inspection
LEADERSHIP INSIGHTS
See all insights