In 1994 and 1995, Associated Engineering was responsible for upgrading the fatigue endurance of the North Approach spans to the Skybridge on the SkyTrain Guideway System. When an initial structural analysis indicated that the other section of steel Guideway on the system would benefit from enhanced fatigue capacity, BC Transit, again, engaged Associated Engineering to complete the structural upgrade.
Associated Engineering designed the upgrade for the section of Guideway near Grandview Cut using the same, innovative, technique developed for the North Approach. The design involves the use of Spirol pins to increase the connectivity between the steel-box girder and the concrete deck, thereby improving the shear fatigue capacity.
The scope of work completed by Associated Engineering for the Grandview Cut structural upgrade includes:
- Completing additional analysis to establish the shear capacity and deficiencies of the existing structure
- Developing an upgrading philosophy
- Coordinating a limited testing program on specimens to ensure that the results of the original fatigue testing program carried out for the North Approach spans can be adapted to this application
- Designing fatigue shear capacity improvements
- Developing construction specifications and drawings for the upgrading work.
![Map Image](https://www.ae.ca/wp-content/themes/ae/images/maps/BC.png)
![Blue Section](https://www.ae.ca/wp-content/themes/ae/images/blue_section.png)
Project Highlights
More Bridges Projects
See all projects
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/sea-to-sky-tn.jpg)
Asset Management
Sea to Sky Highway – Bridge Structural Engineering Services
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/howards-pass-access-road-4.jpg)
Bridges
Howard’s Pass Access Road Bridge Replacement and Road Improvement
![Project Image](https://www.ae.ca/wp-content/uploads/2024/03/overlea-blvd-bridge-rehab-tn.jpg)
Transportation
Overlea Blvd. Bridge Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/img_pittriverbridge02_20160330-1.jpg)
Transportation
Pitt River Bridge
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/img_moti_eqiam_donkennedy-1.jpg)
Transportation
BC Earthquake Integrated Asset Management Plan
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/glenmore-dam-tn.jpg)
Transportation
Glenmore Dam Utility Relocation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/P3070202.jpg)
Bridges
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Transportation
John Hextall Bridge Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/alexandra-bridge-thumb.jpg)
Bridges
Alexandra Bridge Deck Rehabilitation and Seismic Retrofit
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/img-2370da9391b316d6b9fc9ff00001037d2.jpg)
Bridges
Knight Street Bridge Upgrading
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/thumb3016a9391b316d6b9fc9ff00001037d2.jpg)
Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment
![Project Image](https://www.ae.ca/wp-content/uploads/2024/01/haisla-bridge-tn.jpg)
Transportation
Haisla Bridge Replacement
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/nass-river-bridge-tn.jpg)
Bridges
Nass River Bridge Replacement
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/fifth_bridge_jasper_tn.jpg)
Bridges
Fifth Bridge Replacement
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/bon-accord-pedestrian-bridge.jpg)
Active Transportation
Bon Accord Pedestrian Bridge
LEADERSHIP INSIGHTS
See all insights