As engineer for the City of Burnaby’s bridge management program, Associated Engineering identified the Lake City Overhead Bridge for significant rehabilitation, seismic assessment and retrofit.
This four lane, four-span box girder bridge carries Gaglardi Way and provides access to Burnaby Mountain and Simon Fraser University. The bridge was constructed in 1965, prior to modern seismic provision. The bridge deck and pier caps had become significantly deteriorated.
The City retained Associated Engineering to conduct a full structural inspection; study the potential seismic retrofit strategies; conduct detailed design of the serviceability and seismic retrofit; prepare tender documents; provide contract administration services; and provide construction inspection services.
![Map Image](https://www.ae.ca/wp-content/themes/ae/images/maps/BC.png)
Client
City of Burnaby
![Blue Section](https://www.ae.ca/wp-content/themes/ae/images/blue_section.png)
Project Highlights
Associated Engineering carried out a detailed condition survey of the concrete deck and selected substructure components, and developed a repair strategy that would eliminate all of the existing deck joints. The parallel seismic retrofit study suggested that this work could be effectively incorporated as part of the seismic retrofit design. The result was a seismic retrofit in conjunction with a deck and pier rehabilitation.
More Bridges Projects
See all projects
![Project Image](https://www.ae.ca/wp-content/uploads/2023/04/baxter-bridge-thumbnail.jpg)
Infrastructure
Baxter Bridge Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/casino-mine-tn.jpg)
Transportation
Casino Mine Access Road
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/IMG_3254.jpg)
Bridges
SkyTrain Grandview Cut Structural Upgrade
![Project Image](https://www.ae.ca/wp-content/uploads/2024/03/overlea-blvd-bridge-rehab-tn.jpg)
Transportation
Overlea Blvd. Bridge Rehabilitation
Transportation
John Hextall Bridge Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2024/03/don-river-blvd-bridge-rehab-tn.jpg)
Transportation
Don River Blvd. Bridge Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/NIX_2785.jpg)
Asset Management
Canmore Bridge Management
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/Edmonton-Skyline-2013_0018.jpg)
Bridges
Rossdale Bridge Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/howards-pass-access-road-4.jpg)
Bridges
Howard’s Pass Access Road Bridge Replacement and Road Improvement
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/burrard-bridge-envision.jpg)
Bridges
Burrard Bridge Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/mountain-highway-thumb.jpg)
Active Transportation
Highway 1 at Mountain Highway Interchange
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/IMG_0817.jpg)
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/salton-road-bridge-tn.jpg)
Active Transportation
Salton Road Pedestrian and Cycle Bridge
![Project Image](https://www.ae.ca/wp-content/uploads/2024/07/whitemud-creek-tn.jpg)
Transportation
Whitemud Creek Oxbow Boardwalk
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/img_pittriverbridge02_20160330-1.jpg)
Transportation
Pitt River Bridge
LEADERSHIP INSIGHTS
See all insights