As engineer for the City of Burnaby’s bridge management program, Associated Engineering identified the Lake City Overhead Bridge for significant rehabilitation, seismic assessment and retrofit.
This four lane, four-span box girder bridge carries Gaglardi Way and provides access to Burnaby Mountain and Simon Fraser University. The bridge was constructed in 1965, prior to modern seismic provision. The bridge deck and pier caps had become significantly deteriorated.
The City retained Associated Engineering to conduct a full structural inspection; study the potential seismic retrofit strategies; conduct detailed design of the serviceability and seismic retrofit; prepare tender documents; provide contract administration services; and provide construction inspection services.
Client
City of Burnaby
Project Highlights
Associated Engineering carried out a detailed condition survey of the concrete deck and selected substructure components, and developed a repair strategy that would eliminate all of the existing deck joints. The parallel seismic retrofit study suggested that this work could be effectively incorporated as part of the seismic retrofit design. The result was a seismic retrofit in conjunction with a deck and pier rehabilitation.
More Bridges Projects
See all projects
Active Transportation
Whitemud Creek Boardwalk Replacement – Environmental Assessments
Bridges
Howard’s Pass Access Road Bridge Replacement and Road Improvement
Bridges
Deh Cho Bridge, Quality Management Services
Bridges
Outlook Truss Bridge Assessment
Asset Management
Sea to Sky Highway – Bridge Structural Engineering Services
Bridges
SkyTrain Grandview Cut Structural Upgrade
Bridges
Beaverdams Road and Power Canal Bridges
Bridges
Miette Hot Springs Culvert and Bridge Replacement
Bridges
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Bridges
Close Proximity Bridge Inspections – Chilliwack Forest District and Chinnok BCTS Business Area
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Bridges
West Main Street Bridge Restoration
Pedestrian Bridges
Hangingstone River Pedestrian Bridge
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Transit