Location
Fort McMurray, Alberta
Expertise
Share
Associated Engineering provided overall design, project management, hydrotechnical analysis, construction services and coordination of work with the Department of Fisheries and Oceans, Alberta Environment and utility owners.
The project comprised the design and construction of a river crossing bridge, which consisted of a 30 metre steel girder founded on driven steel pipe piles. The deck comprised 11 metre full width deck panels with a transverse reinforced joint.
With a compressed design time frame and construction window, we incorporated a number of the features used in BC resource sector to expedite construction of the bridge. These included the use of precast concrete deck panels to minimize the amount of cast-in-place concrete work and reduce the duration of construction. In addition to accommodating highway legal traffic, we designed the bridge to accommodate a number of overload vehicles thereby ensuring that the bridge had sufficient capacity to support the transportation of the heavy modules that are integral to the economical construction of the plant.


Project Highlights
More Bridges Projects
See all projects

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Transportation
Waterton National Park Trail Bridge Replacements

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study

Transportation
Frank Channel and Kakisa River Bridge Assessment

Infrastructure
Howard’s Pass Access Road Bridge Replacement and Road Improvement

Transportation
Sutherland Ave Pedestrian Bridge

Transportation
Still Creek Pedestrian Bridge Replacement

Transportation
Outlook Truss Bridge Assessment

Bridges
Rossdale Bridge Rehabilitation

Bridges
Fifth Bridge Replacement

Transportation
170th Street Pedestrian Bridge

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Infrastructure
Nass River Bridge Replacement

Transportation
Battleford Truss Bridge Rehabilitation

Transportation