Location
Welland, Ontario
Expertise
Bridges
Share
Designated a Canadian Heritage Structure, the City of Welland’s historic West Main Street Bridge had experienced severe corrosion over the years.
The Regional Municipality of Niagara retained Associated Engineering to complete design and oversee construction to refurbish the 85 year old bridge, which is a local landmark and vital transportation link in the Region.
Associated’s design of the rehabilitation works restored the structure while minimizing impact to residents, businesses, traffic, and the environment. The bridge’s new intelligent LED lighting system reduces energy costs and provides an aesthetic feature, with changing colours to mark special events and holidays, contributing to Downtown Welland’s Revitalization.
Client
The Regional Municipality of Niagara
Award
Consulting Engineers of Ontario, Award of Excellence
Project Highlights
85 years
age of bridge
More Bridges Projects
See all projects
Bridges
Fifth Bridge Replacement
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Transportation
184 Street and Yellowhead Trail Interchange
Transportation
Don River Blvd. Bridge Rehabilitation
Transportation
St. Andrews Lock and Dam Bridge Deck Replacement
Transportation
Fourth Street Pedestrian Overpass
Transportation
Overlea Blvd. Bridge Rehabilitation
Bridges
Seymour Canyon Suspension Bridge
Asset Management
Canmore Bridge Management
Bridges
Pedestrian Bridge 151 Rehabilitation
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Transportation
Glenmore Dam Utility Relocation
Infrastructure
Churchill Airport Runway Upgrades
Bridges
St. Paul’s Bridge Load Rating and Analysis
Bridges