
Close Proximity Bridge Inspections – Chilliwack Forest District and Chinnok BCTS Business Area
Location
Chilliwack, British Columbia
Expertise
Bridges
Structures
Share
The BC Ministry of Forests and Range retained Associated Engineering to inspect a total of 184 structures in the Chilliwack Forest District and the Chinook BCTS Business Area.
The structures varied from multi-span steel, concrete and log structures to major culverts.
The inspection involved visual and physical (non-destructive) testing of log stringer, steel, concrete bridge and culvert components for structural deficiencies.
The inspection data was entered into digital Inspection Data Forms in Microsoft Access format for download into the Coast Forest Region Bridge Register. Each report included GPS coordinates, structural deficiencies, measurements to facilitate load rating, date of next inspection and photos.


Project Highlights
More Bridges Projects
See all projects

Bridges
St. Paul’s Bridge Load Rating and Analysis

Bridges
Miette Hot Springs Culvert and Bridge Replacement

Bridges
Howard’s Pass Access Road Bridge Replacement and Road Improvement

Transportation
Fourth Street Pedestrian Overpass

Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment

Bridges
Muskeg River Bridge

Bridges
Fifth Bridge Replacement

Infrastructure
Churchill Airport Runway Upgrades

Active Transportation
Bon Accord Pedestrian Bridge

Bridges
Rossdale Bridge Rehabilitation

Active Transportation
Salton Road Pedestrian and Cycle Bridge

Bridges
Nass River Bridge Replacement

Transportation
184 Street and Yellowhead Trail Interchange

Bridges
Yoho Bridge Concrete Design

Environmental