
Close Proximity Bridge Inspections – Chilliwack Forest District and Chinnok BCTS Business Area
Location
Chilliwack, British Columbia
Expertise
Bridges
Structures
Share
The BC Ministry of Forests and Range retained Associated Engineering to inspect a total of 184 structures in the Chilliwack Forest District and the Chinook BCTS Business Area.
The structures varied from multi-span steel, concrete and log structures to major culverts.
The inspection involved visual and physical (non-destructive) testing of log stringer, steel, concrete bridge and culvert components for structural deficiencies.
The inspection data was entered into digital Inspection Data Forms in Microsoft Access format for download into the Coast Forest Region Bridge Register. Each report included GPS coordinates, structural deficiencies, measurements to facilitate load rating, date of next inspection and photos.


Project Highlights
More Bridges Projects
See all projects

Bridges
Rossdale Bridge Rehabilitation

Bridges
Sundance Crossings

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services

Transportation
Overlea Blvd. Bridge Rehabilitation

Bridges
Camrose Creek Bridge Replacement

Transportation
Outlook Truss Bridge Assessment

Bridges
St. Paul’s Bridge Load Rating and Analysis

Bridges
Battle Creek Road Bridge Replacement

Transportation
184 Street and Yellowhead Trail Interchange

Transportation
Still Creek Pedestrian Bridge Replacement

Bridges
Westshore Terminals Overpass

Infrastructure
Churchill Airport Runway Upgrades

Transportation
Pitt River Bridge

Bridges