Location
Burnaby, British Columbia
Expertise
Bridges
Share
The Willingdon Avenue Overpass crosses the Burlington Northern rail tracks and two roadways approximately half a kilometre north of the Trans-Canada Highway.
Constructed in 1967, the 75 metre-long, three-span bridge carries six lanes of traffic along an important traffic artery and designated disaster response route. The overpass consists of ten, three-span, continuous pre-stressed concrete I girders, with a continuous concrete deck slab; and a substructure consisting of cast-in-place abutments and two inclined precast column piers, founded on spread footings. Both abutments are seated on fill retained by concrete retaining walls. The inclined pier columns are pinned at either end and provide little or no lateral restraint to the bridge.
Client
City of Burnaby
Project Highlights
The City of Burnaby retained Associated Engineering to complete a seismic evaluation and design of seismic upgrades.The assessment of the bridge identified several seismic vulnerabilities, including insufficient abutment wall strength, inadequate girder seat lengths and shear keys at girder ends, and deficient connections between the precast columns and girders. The seismic retrofit scheme consisted of soil anchors at both abutments to stabilize the abutment retaining walls; concrete shear blocks at the north abutment to prevent transverse sliding of the abutment; shear keys between the precast girders at each abutment; and column restrainers at each girder–column connection.
Following design, Associated Engineering provided contract administration and construction inspection services for the $0.5 million seismic retrofit construction contract.
More Bridges Projects
See all projects
Transportation
Coast Meridian Overpass Detailed Inspection
Transportation
BC Earthquake Integrated Asset Management Plan
Bridges
Battle Creek Road Bridge Replacement
Transportation
South Fraser Perimeter Road – Bridge Structural Engineering Services
Transportation
Duggan Bridge Replacement
Active Transportation
Salton Road Pedestrian and Cycle Bridge
Asset Management
Sea to Sky Highway – Bridge Structural Engineering Services
Bridges
Fifth Bridge Replacement
Bridges
Stony Trail/Bow River Bridge Fog Detection System
Bridges
Deh Cho Bridge
Environmental
Deh Cho Bridge, Environmental Services
Bridges
Deh Cho Bridge, Quality Management Services
Bridges
St. Paul’s Bridge Load Rating and Analysis
Transportation
Kapuskasing River Bridge
Bridges
Frank Channel and Kakisa River Bridge Assessment
LEADERSHIP INSIGHTS
See all insights