The Deh Cho Bridge provides a year-round connection for northern residents with the rest of Canada, and will help create economic development opportunities in the North.
For decades, the majority of residents in the Northwest Territories had no fixed link to the rest of the country. Travellers and goods had to cross the Mackenzie, Canada’s longest river, via a limited-operation ferry.
In 2010, the Government of the Northwest Territories assumed control of the project mid-construction, and appointed Associated Engineering as Project Manager. Working together, we implemented a specific project management plan, addressing project challenges, including a geographically dispersed team, a remote site, extreme weather conditions, and quality management.
Client
The Government of the Northwest Territories
Project Highlights
Effective planning and communication between all stakeholders was a critical factor in managing the project’s progress and facilitated the project’s ultimate success. In addition to collaborative project meetings and a highly-effective project document control system, our team worked closely with the client to develop unique approaches to control schedule, budget, quality, and risk. The community was kept fully informed via quarterly newsletters, information boards, a project website, a live webcam, and consistent contact with the media, thus providing a clear understanding of the construction progress and eventual grand opening.
People on this project
More Bridges Projects
See all projects
Bridges
170th Street Bridge Over CN Rail Bissell Yard
Bridges
Beaverdams Road and Power Canal Bridges
Bridges
Burrard Bridge Rehabilitation
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Bridges
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Asset Management
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
Pedestrian Bridges
Hangingstone River Pedestrian Bridge
Bridges
Pedestrian Bridge 151 Rehabilitation
Transportation
Coast Meridian Overpass
Transportation
Granville Bridge Seismic Retrofit and Renewal
Bridges
Yoho Bridge Concrete Design
Transportation
Ray Gibbon Drive Twinning
Environmental
Phase III ESA and Remedial Action Plan at Fort Providence Ferry Landings and Maintenance Compound
Transportation
Medicine Hat Boardwalk Replacements
Transportation
Kapuskasing River Bridge
LEADERSHIP INSIGHTS
See all insights