
Close Proximity Bridge Inspections – Chilliwack Forest District and Chinnok BCTS Business Area
Location
Chilliwack, British Columbia
Expertise
Bridges
Structures
Share
The BC Ministry of Forests and Range retained Associated Engineering to inspect a total of 184 structures in the Chilliwack Forest District and the Chinook BCTS Business Area.
The structures varied from multi-span steel, concrete and log structures to major culverts.
The inspection involved visual and physical (non-destructive) testing of log stringer, steel, concrete bridge and culvert components for structural deficiencies.
The inspection data was entered into digital Inspection Data Forms in Microsoft Access format for download into the Coast Forest Region Bridge Register. Each report included GPS coordinates, structural deficiencies, measurements to facilitate load rating, date of next inspection and photos.


Project Highlights
More Bridges Projects
See all projects

Bridges
Sundance Crossings

Bridges
Yoho Bridge Concrete Design

Transportation
Casino Mine Access Road

Bridges
Ross River Pedestrian Bridge Rehabilitation

Transportation
Granville Bridge Seismic Retrofit and Renewal

Bridges
SkyTrain Grandview Cut Structural Upgrade

Transportation
184 Street and Yellowhead Trail Interchange

Transportation
Pedestrian Bridge 151 Rehabilitation

Transportation
Little Smoky Bridge Inspection, Load Rating and Assessment

Transportation
McKay River Bridge

Transportation
Overlea Blvd. Bridge Rehabilitation

Bridges
St. Paul’s Bridge Load Rating and Analysis

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Infrastructure
Churchill Airport Runway Upgrades

Transportation
BC Earthquake Integrated Asset Management Plan
LEADERSHIP INSIGHTS
See all insights



