Close Proximity Bridge Inspections – Chilliwack Forest District and Chinnok BCTS Business Area
Location
Chilliwack, British Columbia
Expertise
Bridges
Structures
Share
The BC Ministry of Forests and Range retained Associated Engineering to inspect a total of 184 structures in the Chilliwack Forest District and the Chinook BCTS Business Area.
The structures varied from multi-span steel, concrete and log structures to major culverts.
The inspection involved visual and physical (non-destructive) testing of log stringer, steel, concrete bridge and culvert components for structural deficiencies.
The inspection data was entered into digital Inspection Data Forms in Microsoft Access format for download into the Coast Forest Region Bridge Register. Each report included GPS coordinates, structural deficiencies, measurements to facilitate load rating, date of next inspection and photos.
Project Highlights
More Bridges Projects
See all projects
Transportation
Casino Mine Access Road
Bridges
Rossdale Bridge Rehabilitation
Transportation
Bobtail Forest Service Road Overpass
Bridges
Engineering services for Houston Forest Products
Transportation
Glenmore Dam Utility Relocation
Bridges
Lake City Overhead Seismic Retrofit and Structural Rehabilitation
Transportation
Ray Gibbon Drive Twinning
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Pedestrian Bridges
Dayton Street Pedestrian and Cycling Overpass
Pedestrian Bridges
Hangingstone River Pedestrian Bridge
Bridges
Miette Hot Springs Culvert and Bridge Replacement
Bridges
Pedestrian Bridge 151 Rehabilitation
Transportation
184 Street and Yellowhead Trail Interchange
Bridges
SkyTrain Grandview Cut Structural Upgrade
Bridges