Location
Edmonton, Alberta
Expertise
Water
Hydrotechnical
Share
Streambank erosion has been occurring for some time and is threatening City infrastructure, adjacent homes, and park facilities in the Mill Creek trail network.
The City of Edmonton requested Associated Engineering to assess the existing and potential erosion sites, provide mitigation measures and develop an erosion control plan, and identify flood risk areas along Mill Creek in Southeast Edmonton.
Key objectives were:
- Assess the degree of erosion potential and flood risk for the various reaches of Mill Creek that minimizes the long-term risk to the City.
- Provide an implementation plan with projected mitigation requirements and associated costs; identify any upgrading requirements that need to be addressed on a priority basis.
- Provide a knowledge-based erosion control plan that can be communicated to the City, and other stakeholders of the present and future, and is integrated with the City’s overall vision for sustainability and environmental protection and Mill Creek trail network.
- Enhance the knowledge base of City’s staff and inform the future development of a Trail Master Plan for Mill Creek.
Client
The City of Edmonton
Project Highlights
The assessment was completed using a coupled 1-D and 2-D model using Mike FLOOD to estimate flood depths, extents, velocity, and shear stress within the channel and to identify vulnerable areas and assess options. This was supported by a morphological assessment to identify remedial measures and costs for a variety of erosion control measures.
More Water Projects
See all projects
Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade
Water Treatment
Russell Binscarth Water Treatment Plant
Environmental
Big Bend Master Drainage Plan
Infrastructure
Rosehill Reservoir Rehabilitation
Environmental Planning
Watershed Resilience and Restoration Program: Identification of priority areas
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Pump Stations
Avenue H Reservoir and Pump Station
Water
Fort Chipewyan Water Treatment Plant Expansion
Energy
Solar Feasibility Study for Medicine Hat Reservoirs
Infrastructure
Kluskus Village Domestic Water System Improvements
Water
Jericho Reservoir
Infrastructure
Pelican Lake First Nation Water Treatment Plant Expansion
Infrastructure
Melville Water Treatment Plant
Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement
Pump Stations
Skyline Pump Station
LEADERSHIP INSIGHTS
See all insights