The Johnson-Mariner Connector comprises a 245 m long, four-lane bridge, an integral 100 m long two-lane ramp, 300 m of new road, 700 m of improvements to the Barnet Highway, water main, streetlighting, and provision for pedestrian and bicycle traffic.
The structure provides a grade-separated crossing of the CP Rail mainline and West Coast Express Commuter Rail, and crosses over the environmentally-sensitive Scott Creek flood plain and under BC Hydro power lines.
After extensive evaluation, MoT engaged the design-build team of Peter Kiewit and Sons and Associated Engineering. The team’s design-build concept dealt most effectively with the site’s sensitive geotechnical and environmental conditions, reduced land requirements, and provided the most innovative and aesthetically-pleasing solution.


Project Highlights
245m
four-lane bridge
100m
two-lane ramp
300m
new road
700m
improvements
Preloading the north approach and the use of piles for supporting the structure minimized the height of approach fills, reduced long-term settlement concerns, and improved accessibility beneath the elevated roadways. The use of a slender structure reduced the road grades, thereby minimizing the impact on adjacent properties. Despite a relatively heavy superstructure in a high seismic zone, the concrete slab solution proved to be 25% less costly than conventional designs.
More Roads Projects
See all projects

Transportation
184 Street and Yellowhead Trail Interchange

Infrastructure
Buffalo Creek Culvert Replacement

Transportation
7 Avenue S. Bike Boulevard

Transportation
2021 Flood Recovery – Nicomen Community Bridge Planning Study

Transportation
Edmonton Valley Line – Stage 1

Intelligent Transportation Systems
City of St. Albert ITS Strategic Plan

Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways

Landscape Architecture
49th Avenue Reconstruction

Bridges
Stony Trail/Bow River Bridge Fog Detection System

Intelligent Transportation Systems
City of Prince Albert Traffic Signal Timing Design

Environmental Assessment
Fischer-Hallman Road Environmental Assessment

Roads
North West Welland Secondary Plan

Infrastructure
Johnston Canyon Campground Upgrades

Bridges
Howard’s Pass Access Road Bridge Replacement and Road Improvement

Streetscaping
Nigel Valley Public Spaces
LEADERSHIP INSIGHTS
See all insights