Location
Lethbridge, Alberta
Expertise
Transportation
Active Transportation
Roads
Traffic Engineering
Share
Associated Engineering has helped the City of Lethbridge join the ranks of other major Canadian cities by providing detailed design, community engagement and construction services for the City’s first bike boulevard on the beautiful and historic 7 Avenue S from 4 St S to Mayor Magrath Drive through the neighbourhoods of London Road and Victoria Park.
A bike boulevard is a roadway that has been modified to make cycling more comfortable and safer.
7 Avenue S now provides cyclists with a viable and safe route for east-west travel through the City. The west end of the corridor connects to the City’s regional pathway and the east end connects to a 4.8 km north-south separated multi-use pathway along Mayor Magrath Drive as well as Henderson Lake, the new swimming pool, Spitz Stadium and the SLP Skatepark.
Client
City of Lethbridge
Project Highlights
More Transportation Projects
See all projects
Transit
SkyTrain Fraser River Crossing North Approach Spans
Transportation
Bellevue Creek Bridge
Transportation
Sutherland Ave Pedestrian Bridge
Streetscaping
Langford Cultural District
Bridges
Coast Meridian Bridge
Infrastructure
Johnston Canyon Campground Upgrades
Transportation
Transportation Planning and Functional Design of Burquitlam-Lougheed Neighbourhood Greenways
Transportation
184 Street and Yellowhead Trail Interchange
Pedestrian Bridges
Hangingstone River Pedestrian Bridge
Airports
Calgary Airport Glycol Treatment Facility
Bridges
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design
Transportation
Cold Lake CRISP
Transportation
Ray Gibbon Drive Twinning
Bridges
SkyTrain Grandview Cut Structural Upgrade
Transportation