Location
Yellowknife, NWT
Expertise
Transportation
Share
The project was undertaken to improve transportation efficiencies on the Tibbitt to Contwoyto Winter Road (TCWR), while ensuring a high level of safety and no additional risk to winter road operators and drivers.
NOR•EX Engineering provided ice engineering design, ice loading tables, and quality assurance program for improved transportation up the TCWR to resupply three diamond mines north of Yellowknife. The project team provided the ice engineering design and overall quality assurance programs.
The enhancements saved the client 116 fewer truckloads in 2014; achieved a 5% increase in truck payload capacity until the Winter Road was operating at maximum capacity (100% Super B Gross Vehicle Weight); and provided an operational cost savings in excess of $600,000/year moving forward.


Project Highlights
More Transportation Projects
See all projects

Pedestrian Bridges
Hangingstone River Pedestrian Bridge

Streetscaping
Langford Cultural District

Infrastructure
Highway 69 Twinning

Transportation
Coast Meridian Overpass

Transportation
Bobtail Forest Service Road Overpass

Land Development
Royal Bay Subdivision

Transportation
Battleford Truss Bridge Rehabilitation

Transportation
Freegold Road Functional Plan

Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit

Transportation
St. Andrews Lock and Dam Bridge Deck Replacement

Transportation
Agassiz-Rosedale Bridge – Renewal Options Analysis and Preliminary Rehabilitation Design

Transportation
170th Street over CN Rail Bridge Rehabilitations

Transportation
Don River Blvd. Bridge Rehabilitation

Roads
Highway 91/91A Queensborough and Howes Interchanges

Transportation
Haisla Bridge Replacement
LEADERSHIP INSIGHTS
See all insights








