Location
Yellowknife, NWT
Expertise
Transportation
Share
The project was undertaken to improve transportation efficiencies on the Tibbitt to Contwoyto Winter Road (TCWR), while ensuring a high level of safety and no additional risk to winter road operators and drivers.
NOR•EX Engineering provided ice engineering design, ice loading tables, and quality assurance program for improved transportation up the TCWR to resupply three diamond mines north of Yellowknife. The project team provided the ice engineering design and overall quality assurance programs.
The enhancements saved the client 116 fewer truckloads in 2014; achieved a 5% increase in truck payload capacity until the Winter Road was operating at maximum capacity (100% Super B Gross Vehicle Weight); and provided an operational cost savings in excess of $600,000/year moving forward.
Project Highlights
More Transportation Projects
See all projects
Transportation
184 Street and Yellowhead Trail Interchange
Transportation
Waterton National Park Trail Bridge Replacements
Transportation
Broadway Street Improvements
Bridges
Seymour Canyon Suspension Bridge
Transit
SkyTrain Crossing of South Point Drive
Transportation
Northwest Territories ITS Program
Infrastructure
Baxter Bridge Rehabilitation
Pedestrian Bridges
Hangingstone River Pedestrian Bridge
Transportation
Pitt River Bridge
Transportation
Fourth Street Pedestrian Overpass
Transportation
Coast Meridian Overpass
Transportation
Cold Lake CRISP
Airports
Calgary Airport Glycol Treatment Facility
Transportation
Cowichan Valley Trail Bridges Condition Inspection and Load Rating
Transportation
Kapuskasing River Bridge
LEADERSHIP INSIGHTS
See all insights