The project was undertaken to improve transportation efficiencies on the Tibbitt to Contwoyto Winter Road (TCWR), while ensuring a high level of safety and no additional risk to winter road operators and drivers.
NOR•EX Engineering provided ice engineering design, ice loading tables, and quality assurance program for improved transportation up the TCWR to resupply three diamond mines north of Yellowknife. The project team provided the ice engineering design and overall quality assurance programs.
The enhancements saved the client 116 fewer truckloads in 2014; achieved a 5% increase in truck payload capacity until the Winter Road was operating at maximum capacity (100% Super B Gross Vehicle Weight); and provided an operational cost savings in excess of $600,000/year moving forward.
![Map Image](https://www.ae.ca/wp-content/themes/ae/images/maps/NWT.png)
![Blue Section](https://www.ae.ca/wp-content/themes/ae/images/blue_section.png)
Project Highlights
More Transportation Projects
See all projects
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/NIX_5169.jpg)
Transportation
Highway 7 Haney Bypass Intersection Improvements
![Project Image](https://www.ae.ca/wp-content/uploads/2023/08/NIX2397-copy.jpg)
Transportation
Bellevue Creek Bridge
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/YVR-Runway-Thumb.jpg)
Airports
Vancouver International Airport Parallel Runway
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/freegold-tn-1.jpg)
Transportation
Freegold Road Functional Plan
![Project Image](https://www.ae.ca/wp-content/uploads/2023/09/NIX_6957-copy.jpg)
Bridges
Coast Meridian Bridge
![Project Image](https://www.ae.ca/wp-content/uploads/2024/01/haisla-bridge-tn.jpg)
Transportation
Haisla Bridge Replacement
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/IMG_2525.jpg)
Seismic Evaluation & Retrofitting
Mission Bridge Seismic Retrofit
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/img_still_creek_bridge_replacement_06_20180711_jk.jpg)
Transportation
Still Creek Pedestrian Bridge Replacement
![Project Image](https://www.ae.ca/wp-content/uploads/2024/03/overlea-blvd-bridge-rehab-tn.jpg)
Transportation
Overlea Blvd. Bridge Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/08/NIX_2368.jpg)
Streetscaping
Vanalman Avenue Upgrades
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/thumbnail_bermuda_airport.jpg)
Transportation
Bermuda Runway Rehabilitation
![Project Image](https://www.ae.ca/wp-content/uploads/2023/07/NIX_2744.jpg)
Infrastructure
Johnston Canyon Campground Upgrades
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/IMG_3254.jpg)
Bridges
SkyTrain Grandview Cut Structural Upgrade
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/YYC-Glycol.jpg)
Airports
Calgary Airport Glycol Treatment Facility
![Project Image](https://www.ae.ca/wp-content/uploads/2023/06/calgary-airport-tn.jpg)
Transportation
Calgary Airport Runway and Tunnel
LEADERSHIP INSIGHTS
See all insights