Location
Norman Wells, NWT
Expertise
Infrastructure
Ice Engineering
Share
The client undertook a large blasting and hauling operation as part of the infrastructure improvements supporting the Slater River Project.
NOR•EX Engineering provided safety services, ice engineering, and a road management plan for an ice crossing over the Mackenzie River, south of Norman Wells, Northwest Territories.
The client transported approximately 65-70 loads per day across the Mackenzie River, for close to 60 days, for an overall haul total of 130,000 tonnes. The program recorded zero ice related incidents during the season. The services provided improved efficiencies and cost savings for the client’s hauling program within a strong safety environment.
Client
NOR•EX Engineering
Project Highlights
65-70
transported loads per day
130,000t
for 60 days
More Infrastructure Projects
See all projects
Infrastructure
Oakville Fourth Line Closed Landfill
Infrastructure
Minnedosa Community Housing
Infrastructure
Gitwinksihlkw Water Treatment Plant
Transportation
Bellevue Creek Bridge
Transportation
Overlea Blvd. Bridge Rehabilitation
Parks & Recreation
Pexsisen Elementary School
Infrastructure
Melville Water Treatment Plant
Infrastructure
Mooney Forest Service Road
Building Mechanical
South Arm District Energy Utility Phase 1 Technical Feasibility Study
Infrastructure
Trestle No. 3 Rehabilitation and Steel Pipe Replacement
Infrastructure
Pelham Patrol Yard Fuel Tank Replacement
Environmental Assessment
Fischer-Hallman Road Environmental Assessment
Transportation
St. Andrews Lock and Dam Comprehensive Detailed Inspection
Infrastructure
North Interceptor Sanitary Trunk
Energy