Location
Kelowna, British Columbia
Expertise
Building Mechanical
Building Structures
Share
Van Kam Freightways Ltd. ships over 1 billion pounds of goods annually in British Columbia and Alberta. Expansion of coverage required upgrades to the infrastructure system beginning with a new freight way terminal in Kelowna, BC.
The success of this terminal initiated construction of a second terminal one year later in Prince George, BC.
Associated Engineering’s assignment included the detailed design of a both freight way terminals. Each terminal consists of an 8500 ft2 engineered steel warehouse and 5000 ft2 engineered two-storey office building. The warehouse facility took advantage of a cost-effective pre-engineered building solution. The office building combined cross-laminated (CLT) timber floor panels on heavy timber framing with CLT shear walls and exterior timber walls made of structural insulated panels for a robust building construction.

Client
Van Kam Freightways Ltd.

Project Highlights
8500ft2
engineered steel warehouse
5000ft2
engineered office building
People on this project
More Building Mechanical Projects
See all projects

Pump Stations
12th Avenue Drainage Pump Station

Buildings
Misericordia Community Hospital Electrical Upgrades

Building Mechanical
Woodward WWTP Headworks Biofilter Upgrades

Building Mechanical
Eiling Kramer Campground Park Service Centre

Building Mechanical
Elijah Smith School Energy Audit

Building Mechanical
Jim Pattison Centre of Excellence Building Technologies and Renewable Energy Conservation

Building Mechanical
St. Albert Naki Transit Centre and Park & Ride

Building Mechanical
Residuals Treatment Facility

Pump Stations
Skyline Pump Station

Buildings
Stoney Nakoda Child & Family Services Building Assessment

Building Mechanical
Scott Street Sewage Pumping Station Upgrades

Buildings
Climate Change Risk Assessment for Buildings

Buildings
North Wall Sewage Treatment Plant and Main Lift Station Upgrade

Water
Jericho Reservoir

Building Mechanical