Location
Saskatoon, Saskatchewan
Expertise
Building Structures
Landscape Architecture
Parks & Recreation
Share
The PotashCorp Playland at Kinsmen Park was completed in 2015. The existing park was significantly renovated, with the addition of a large number of attractions.
Associated Engineering performed full structural engineering design, detailing and construction administration services on the train station structure, concession stand building, as well as the concrete piled foundations for the ferris wheel and carousel.
The train station is a highly architectural structure comprising an exposed cross-laminated timber roof supported on architectural concrete columns and cladded wood-framed “fin” walls. Complex yet discreet steel connections were required in order to support the long spans of the cross-laminated timber roof structure. There is a glazed clerestory, and the swing gates and sliding doors around the perimeter can be opened or closed depending on the season. The station canopy structure and the waiting platform are supported on a concrete piled foundation.
Project Highlights
More Building Structures Projects
See all projects
Buildings
Manitoba Hydro – Keeyask Camp
Infrastructure
Gitwinksihlkw Water Treatment Plant
Infrastructure
Livestock and Forage Centre of Excellence
Building Structures
Bone Yard Operations Centre Office Expansion
Building Mechanical
Craigflower Pump Station
Infrastructure
Kikendaasogaming Elementary School Deficiency Repairs
Water
Fort Chipewyan Water Treatment Plant Expansion
Building Structures
Oliver Bowen Light Rail Vehicle Storage and Maintenance Facility
Building Mechanical
Eiling Kramer Campground Park Service Centre
Buildings
Wood Innovation and Design Centre
Water Treatment
Russell Binscarth Water Treatment Plant
Buildings
Riel Recreation Park Redevelopment
Building Structures
Fort Hills Power System
Infrastructure
Tsawwassen First Nation Sewage Treatment Plant
Building Mechanical
Centennial Arena Expansion
LEADERSHIP INSIGHTS
See all insights