Location
Saskatoon, Saskatchewan
Expertise
Share
The City of Saskatoon engaged Associated Engineering in conjunction with CH2M Hill to complete the preliminary design, detailed design, and construction administration services for upgrades that include a new treated water storage reservoir, high lift pump station, and ultraviolet disinfection.
The primary objective of the project is to provide sufficient storage to allow the plant to be operated at a constant maximum day flow rate rather than rapidly changing plant production levels to meet peak hour demands. Given the limited availability of land around the existing Water Treatment Plant site, the new reservoir design contained a number design challenges to meet the required storage objectives, which included property constraints, proximity to the existing reservoir, ground conditions, and maintaining traffic.

Client
City of Saskatoon

Project Highlights
$35
Million
More Pump Stations Projects
See all projects

Water
Welland Water Treatment Plant

Buildings
Riel Recreation Park Redevelopment

Infrastructure
Forest Lawn Lift Station

Infrastructure
Oakville Fourth Line Closed Landfill

Pump Stations
Homer Watson Pump Station Upgrade

Building Mechanical
Scott Street Sewage Pumping Station Upgrades

Pump Stations
Faulkner Lift Station

Building Structures
Columbia Street Pump Station

Computational Fluid Dynamics Analysis
City of Saskatoon Reservoir and Pump Station Upgrades – CFD modelling

Infrastructure
Raw Water Supply – Pipeline River Crossing

Environmental Engineering
Regina Hauled Waste Receiving Station

Pump Stations
Barnston/Maple Ridge Pump Station

Strategic Advisory Services
East Side Pump Station Asset Management Plan

Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment

Electrical Instrumentation & Controls