Location
Maple Ridge, British Columbia
Expertise
Pump Stations
Water Supply, Storage, & Distribution
Share
Metro Vancouver provides water to over 2.1 million residents throughout the Lower Mainland.
As part of the Surrey-Langley Water Supply Scheme, the District is proposing to build a new Maple Ridge/Barnston Pump Station. Associated Engineering was retained to provide services for the preliminary design, detailed design, equipment procurement, tender preparation, as well as consulting services during the tender process, construction, and post-construction. Providing an eventual peak hour flow of over 400 ML/d, this pump station will be by far the largest municipal water distribution pump station in the Province. Located by the north ramp of Golden Ears Bridge, it will also have a major role in overall water supply scheme for a number of municipalities including Langley, Maple Ridge and Surrey.
The $25 Million project embraces the Sustainable Region Initiative (SRI) that supports the overall sustainability of projects and the reduction of impacts on the environment resulting from implementation of projects.
Project Highlights
400ML/d
peak hour flow
$25M
project
More Pump Stations Projects
See all projects
Buildings
Riel Recreation Park Redevelopment
Environmental Engineering
Regina Hauled Waste Receiving Station
Building Mechanical
Scott Street Sewage Pumping Station Upgrades
Infrastructure
Oakville Fourth Line Closed Landfill
Pump Stations
Horseshoe Slough Drainage Pump Station
Strategic Advisory Services
City of Regina Lift Station Condition & Operational Assessment
Pump Stations
Skyline Pump Station
Pump Stations
Faulkner Lift Station
Pump Stations
Oakville Water Purification Plant
Building Structures
Columbia Street Pump Station
Infrastructure
Raw Water Supply – Pipeline River Crossing
Computational Fluid Dynamics Analysis
City of Saskatoon Reservoir and Pump Station Upgrades – CFD modelling
Pump Stations
Avenue H Reservoir and Pump Station
Water
Welland Water Treatment Plant
Building Mechanical